My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LAYNE CHRISTENSEN COMPANY
Clerk
>
Contracts / Agreements
>
L
>
LAYNE CHRISTENSEN COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2024 4:01:58 PM
Creation date
9/21/2021 4:32:51 PM
Metadata
Fields
Template:
Contracts
Company Name
LAYNE CHRISTENSEN COMPANY
Contract #
A-2021-161-02
Agency
Public Works
Council Approval Date
8/17/2021
Expiration Date
8/16/2024
Insurance Exp Date
10/1/2025
Destruction Year
2029
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.: 21-059 <br />WATER WELL, PUMP AND MOTOR REHABILITATION AND REPAIR SERVICES <br />voltage and frequency. No load voltage and phase currents shall be recorded. Vibration mils <br />displacement shall be measured and recorded in the horizontal, vertical and axial planes on both <br />ends of the motor, or top and bottom of vertical motors and documentation of current reading and <br />vibration readings shall be provided to the Project Manager. <br />2. A 5KV rneg-ohm meter shall be used to verify insulation continuity of all 4160V motors. <br />ix. Paint <br />1, Exterior of motor shall be properly cleaned of rust and foreign material, prime painted and finish <br />painted with a good grade of machinery enamel, the same color as received unless otherwise <br />specified. Nameplates, machined surfaces and internal parts shall be protected from paint. <br />2. When needed, the interiors of motor frames and parts shall be painted with an insulating paint. <br />This includes rotors, bearing brackets, frame interiors and air deflectors. Windings shall not be <br />painted, <br />x. Incidentals <br />1. In the event that the motor is in poor condition and cannot be repaired, reconditioned or made as <br />new, the Contractor shall notify the Project Manager or Designee immediately. <br />2. All incidental parts requiring replacement, such as bearings, coils, etc, shall be considered <br />included in other items of bid and no additional compensation shall be allowed. <br />7, REWINDING OF ELECTRIC MOTORS <br />When rewinding is done in conjunction with a recondition or repair, many of the items below will be redundant <br />and shall not be performed or charged. The items below apply to stator only (including all tabor, materials <br />and testing necessary for work completion) and shall at a minimum include: <br />a. Pre -Disassembly Test <br />1. Using a 1000 meg-ohm meter, conduct verification for insulation integrity. Acceptable criteria is 5 <br />meg-ohms or higher, <br />2. A 5KV meg-ohm meter shall be used to verify insulation integrity of all 4160V motors. <br />3. Verify that heaters are operational and other attached features such as thermocouples have <br />continuity. <br />4. Pre -disassembly documentation shall include the condition of mechanical fits (i.e, shaft run out), <br />cracked, broken or missing parts, test run at full voltage, current readings, meg reading and surge <br />comparison test as received. The Project Manager shall be notified if acceptable criteria are not met. <br />b. Stripping <br />1. Windings shall be removed by temperature -controlled burnout with oven temperature suppression. <br />Burn -out temperature shall not exceed 750 degrees Fahrenheit. <br />2, Windings shall be removed in such a fashion not to damage or distort the core iron. Upon removal <br />of the old windings and insulation, the core shall be thoroughly cleaned and inspected for burrs, etc. <br />3. After the burnout procedure, the Contractor shall perform a stator core loss test to ensure the stator <br />laminations are not heat damaged. if the stator core losses exceed four (4) watts per pound of core <br />steel, notify the Project Manager prior to proceeding forward. <br />c, Winding <br />1, General: Rewound motors shall meet or exceed all O.E.M. operating characteristics, unless otherwise <br />specified by the Project Manager. NEMA Class H insulation shall be used, unless otherwise <br />specified. Magnet wire shall be a Quad Build, insulated wire of domestic manufacture that meets or <br />exceeds NEMA specification MW-35A, After winding and prior to resin treatment, windings will be <br />surge -comparison tested and the results documented. <br />
The URL can be used to link to this page
Your browser does not support the video tag.