Laserfiche WebLink
STATE OF CALIFORNIA•DEPARTMENT OF TRANSPORTATION <br /> PROJECT PROGRAMMING REQUEST <br /> DTP-0001(Revised July 2017) <br /> General Instructions <br /> Amendment(Existing Project) No Jr b D,ate; 5/13/20 <br /> District....,,,, :`Eft, s •. 'ProJeottID . . ., a;PP.C`��,..{_r a .. P �" �.. ti' ?;_ e: ,,r ..x.Alt;PMl,Ib rr A<:,.,, <br /> 12 1220000052 2175 <br /> . `C,-£,ounty,,. . f2S(ite/Co1`t'idgr PM 8jt,, PfQ'Ahd ,.< . '„ t <.'NCi?tole$'.t'Spaasbl/Leakl ' ofi '. +a.,r' a.;`i''xti:. r`,+'sS rk..,i <br /> ORA Warner Orange County Transportation Authority(OCTA) <br /> ar<a.nera ile`ri]Bttt,s:_ .`...als .. <br /> SCAG Local Assistance <br /> „ iP.'r.'ojeotlylanageT,1,6.PgtgPk{. ,PJlalte .�.,„. i s; ` al,Addtesi aka TL hMs <br /> yAlicia Yang (714)560-5362 avana6a octa net <br /> t' jl.4at.'ri4rtfae „+/ . e . .. >• ,.r' .; r. ,..-.,_Fr F;ySs,#4,<x .'��ir''{.-; �Jd`.u. nn i4 nqa..u",`,p av�,S rv" I�+ '.r.x .,.. iIi <br /> Central Orange County,� Corridor-Traffic Light Synchronization Project-Warner Avenue <br /> l2W ,.n._ Ls) e§ nptjpn2(.`Sc'p 'o,(Ir1 n ee i.cn 1 .,,,,3t tftClAS'«t '4.,. tiOS . E[ izaA:, xa:' .r., <br /> Project Description: Signal Synchronization and required communications Infrastructure on: <br /> •Warner Avenue Signal Sync(PCH to Pullman Street)—approximately 42 Signals-14.4 miles. <br /> Project is a design-build. <br /> I 'j bd fitr``T <br /> PA&ED Various Cities <br /> PS&E OCTA —' t <br /> Right of Way N/A Construction OCTA <br /> TA! e%s a' ja s_t ..a.t«z 3. {„fin';,5,Ki]'e Y.u.€ R isr at.' dr - i <br /> Assembly: 6972 Senate: 34 Congressional: ) 46,48 <br /> Traffic signal synchronization is a cost effective way to reduce travel times,delays,and congestion. It increases the number • <br /> of successive green lights drivers see In daily commutes and gives a perceived Improvement In their drive along the corridor, <br /> The results of signal synchronization translates into direct cost savings for the motorist with less fuel consumption and <br /> reduction of greenhouse gas and other types of carbon and volatile organic compound emissions. <br /> Warner Avenue was last synchronized in 2015. The Institute of Transportation Engineers(ITE)recommends revisiting the <br /> timing every three years to keep up with changing traffic patterns. Legacy equipment require replacements or upgrades in <br /> order to run a seamless operation and to run simultaneous background applications for Connected Autonomous Vehicles <br /> .;,Cetegoty` - - ?Outputs/outcomes -- . _. Unit _ =r.'.j Total .. <br /> Local Streets and Roads Operational Improvements each 42 <br /> ADA Improvements No Bike/Ped Improvements No -..Reve�rsltii ,Lane analysts„ SJNo <br /> I <br /> Includes Sustainable Communities Strategy Goals Yes I. Reduces Greenhouse Gas Emissions Yes <br /> ikft, Existing <br /> Project Study Report Approved N/A N/A d <br /> Begin Environmental(PA&ED)Phase 11/1/19 11/1/19 • <br /> Circulate Draft Environmental Document ICaQA/NEPA :q< CE 12/24/19 12/24/19 <br /> Draft Project Report. N/A N/A <br /> End Environmental Phase(PA&ED Milestone) 1/24/20 1/24/20 <br /> Begin Design(PS&E)Phase 7/1/20 N/A I <br /> End Design Phase(Ready to List for Advertisement Milestone) 11/30/20 N/A <br /> Begin Right of Way Phase N/A N/A <br /> End Right of Way Phase(Right of Way Certification Milestone) N/A N/A <br /> Begin Construction Phase(Contract Award Milestone) 12/1/20 12/24/20 <br /> End Construction Phase(Construction Contract Acceptance Milestone) 11/30/23 12/24/24 <br /> Begin Closeout Phase 12/1/23 12/24/24 <br /> End Closeout Phase(Closeout Report) 6/30/24 12/24/25 <br /> ADA Notieo For individuals with sennnry disabilities,this document Is available In allamato formats.For Information call(916)1354.5410 or TOO(916)654-3880 or <br /> write Records and Forms Management,1120 N Street,MS-89,eacremealu,cA 95914. <br />