STATE OF CALIFORNIA•DEPARTMENT OF TRANSPORTATION
<br /> PROJECT PROGRAMMING REQUEST
<br /> DTP-0001(Revised July 2017)
<br /> General Instructions
<br /> Amendment(Existing Project) No Jr b D,ate; 5/13/20
<br /> District....,,,, :`Eft, s •. 'ProJeottID . . ., a;PP.C`��,..{_r a .. P �" �.. ti' ?;_ e: ,,r ..x.Alt;PMl,Ib rr A<:,.,,
<br /> 12 1220000052 2175
<br /> . `C,-£,ounty,,. . f2S(ite/Co1`t'idgr PM 8jt,, PfQ'Ahd ,.< . '„ t <.'NCi?tole$'.t'Spaasbl/Leakl ' ofi '. +a.,r' a.;`i''xti:. r`,+'sS rk..,i
<br /> ORA Warner Orange County Transportation Authority(OCTA)
<br /> ar<a.nera ile`ri]Bttt,s:_ .`...als ..
<br /> SCAG Local Assistance
<br /> „ iP.'r.'ojeotlylanageT,1,6.PgtgPk{. ,PJlalte .�.,„. i s; ` al,Addtesi aka TL hMs
<br /> yAlicia Yang (714)560-5362 avana6a octa net
<br /> t' jl.4at.'ri4rtfae „+/ . e . .. >• ,.r' .; r. ,..-.,_Fr F;ySs,#4,<x .'��ir''{.-; �Jd`.u. nn i4 nqa..u",`,p av�,S rv" I�+ '.r.x .,.. iIi
<br /> Central Orange County,� Corridor-Traffic Light Synchronization Project-Warner Avenue
<br /> l2W ,.n._ Ls) e§ nptjpn2(.`Sc'p 'o,(Ir1 n ee i.cn 1 .,,,,3t tftClAS'«t '4.,. tiOS . E[ izaA:, xa:' .r.,
<br /> Project Description: Signal Synchronization and required communications Infrastructure on:
<br /> •Warner Avenue Signal Sync(PCH to Pullman Street)—approximately 42 Signals-14.4 miles.
<br /> Project is a design-build.
<br /> I 'j bd fitr``T
<br /> PA&ED Various Cities
<br /> PS&E OCTA —' t
<br /> Right of Way N/A Construction OCTA
<br /> TA! e%s a' ja s_t ..a.t«z 3. {„fin';,5,Ki]'e Y.u.€ R isr at.' dr - i
<br /> Assembly: 6972 Senate: 34 Congressional: ) 46,48
<br /> Traffic signal synchronization is a cost effective way to reduce travel times,delays,and congestion. It increases the number •
<br /> of successive green lights drivers see In daily commutes and gives a perceived Improvement In their drive along the corridor,
<br /> The results of signal synchronization translates into direct cost savings for the motorist with less fuel consumption and
<br /> reduction of greenhouse gas and other types of carbon and volatile organic compound emissions.
<br /> Warner Avenue was last synchronized in 2015. The Institute of Transportation Engineers(ITE)recommends revisiting the
<br /> timing every three years to keep up with changing traffic patterns. Legacy equipment require replacements or upgrades in
<br /> order to run a seamless operation and to run simultaneous background applications for Connected Autonomous Vehicles
<br /> .;,Cetegoty` - - ?Outputs/outcomes -- . _. Unit _ =r.'.j Total ..
<br /> Local Streets and Roads Operational Improvements each 42
<br /> ADA Improvements No Bike/Ped Improvements No -..Reve�rsltii ,Lane analysts„ SJNo
<br /> I
<br /> Includes Sustainable Communities Strategy Goals Yes I. Reduces Greenhouse Gas Emissions Yes
<br /> ikft, Existing
<br /> Project Study Report Approved N/A N/A d
<br /> Begin Environmental(PA&ED)Phase 11/1/19 11/1/19 •
<br /> Circulate Draft Environmental Document ICaQA/NEPA :q< CE 12/24/19 12/24/19
<br /> Draft Project Report. N/A N/A
<br /> End Environmental Phase(PA&ED Milestone) 1/24/20 1/24/20
<br /> Begin Design(PS&E)Phase 7/1/20 N/A I
<br /> End Design Phase(Ready to List for Advertisement Milestone) 11/30/20 N/A
<br /> Begin Right of Way Phase N/A N/A
<br /> End Right of Way Phase(Right of Way Certification Milestone) N/A N/A
<br /> Begin Construction Phase(Contract Award Milestone) 12/1/20 12/24/20
<br /> End Construction Phase(Construction Contract Acceptance Milestone) 11/30/23 12/24/24
<br /> Begin Closeout Phase 12/1/23 12/24/24
<br /> End Closeout Phase(Closeout Report) 6/30/24 12/24/25