Laserfiche WebLink
• Santa Clara Bicycle and Pedestrian Improvements-$3.243 million <br /> • Bus Stop Improvements on Routes 53/553 (Bravol Main Street)-$0.344 million <br /> The total SCCP program award remains the same. <br /> Technical Changes <br /> Bravol Main Street—Five Zero-Emission Buses <br /> • Change from hydrogen fuel-cell to battery electric. With the changes in the State mandates,OCTA <br /> needs to accelerate testing between zero-emission technologies. There is no impact to benefits <br /> as battery-electric buses are still zero-emission. <br /> Project Programming Requests Updates <br /> Warner Avenue Signal Synchronization-$4.092 million <br /> • Updates to schedule to match allocation, contract award,and actual CEQA filing. <br /> • . Updates to the Project Manager/Contacts. Original Project Manager retired. <br /> • Add "Design-Build" in scope. This project was approved as a design build in the application. <br /> Edinger Avenue Signal Synchronization-$4.957 million. <br /> • Updates to schedule to match allocation, contract award, and actual CEQA filing, <br /> • Updates to the Project Manager/Contacts. Original Project Manager retired. <br /> • Add "Design-Build" in scope. This project was approved as a design build in the application. <br /> MacArthur Boulevard/Talbert Avenue Signal Synchronization-$2.951 million <br /> • Updates to schedule to match allocation, contract award,and actual CEQA filing. <br /> • Updates to the project Manager/Contacts. Original Project Manager retired. <br /> • Add "Design-Build" In scope. This project was approved as a design build in the application. <br /> Bravo! Main Street—Five Zero-Emission Buses-$4.330 million <br /> • Updates to scope from Hydrogen Fuel-Cell to Battery-Electric. <br /> • Updates schedule to advance project. <br /> • No changes to benefits as both fuel types are zero-emission. <br /> Add the.following Project Programming Requests <br /> • Santa Clara Bicycle and Pedestrian Improvements-$3,243 million <br /> • Bus Stop Improvements on Routes 53/553 (Bravol Main Street) -$0.344 million <br />