DocuSign Envelope ID: 7DOD574C-B1E5-4A94-98CC-C2B16DDD7DC6 <br />EXHIBIT 5 <br />Grant greemen o. 46 0 3842 <br />Page 33 of 71 <br />This task includes managing contractor submittal review, answering requests for information, and issuing <br />work directives. A full-time engineering construction observer will be on site for the duration of the project. <br />Construction observer duties include documenting of pre -construction conditions, daily construction diary, <br />preparing change orders, addressing questions of contractors on site, reviewing/updating project schedule, <br />reviewing contractor log submittals and pay requests, forecasting cash flow, notifying contractor if work is not <br />acceptable. Upon completing the project, the DWR Certificate of Project Completion and record drawings will <br />be provided to DWR. <br />Deliverables: <br />• DWR Certificate of Project Completion <br />• Record Drawings <br />Construction activities are outlined below <br />11(a): Mobilization will include preparatory work and operations including, but not limited to, those necessary <br />for the movement of personnel, equipment, supplies and incidentals to the project site. Mobilization shall <br />additionally include the establishment of any temporary facilities, utilities, construction fencing and barricades, <br />and the provision and installation of construction signage. <br />11(b): Site preparation will include clearing and grubbing, unclassified excavation, removing and disposing of <br />existing concrete, trees, chain -link fencing, and walls, implementing stormwater BMPs in accordance with the <br />approved Stormwater Pollution Prevention Plan (SWPPP), and rough grading. <br />11(c): Site development will include construction of the 1,600-square-foot bioretention basin including <br />excavation, backfill with gravel and engineered soil, and the installation of mulch and landscaping; and <br />construction of the Stormchamber system, including the pre-treatment forebay, excavation, backfill with <br />gravel, installation of the Stormchamber system, and maintenance cleanout, inlet pipe connection and <br />compaction. Site development also will include construction of the concrete perimeter wall, drinking water <br />fountains, paving, hardscape, and pathways; and installing waste receptacles, utilities, site drainage, and <br />lighting. Off -site improvements will include the construction of a cross -gutter, parkway culverts, new curb and <br />gutter, sidewalk, and paving. <br />Landscaping/signage will include soil preparation and weed abatement, fine grading, planting, and installation <br />of cobblestone, boulders, the irrigation system, project acknowledgment signage, interpretive signage, and <br />site furnishings. <br />• Photographic Documentation of Progress <br />