DocuSign Envelope ID: 7DOD574C-B1 E5-4A94-98CC-C2B16DDD7DC6 <br />EXHIBIT 5 <br />Grant Agreement No. 4600013842 <br />Page 40 of 71 <br />Deliverables: <br />• Project Monitoring Plan <br />Budget Category (d): Construction/Implementation <br />Task 9: Contract Services <br />This task must comply with the Standard Condition D.11 — Competitive Bidding and Procurements. Activities <br />necessary (as applicable) to secure a contractor and award the contract, including: develop bid documents, <br />prepare advertisement and contract documents for construction contract bidding, conduct pre -bid meeting, bid <br />opening and evaluation, selection of the contractor, award of contract, and issuance of notice to proceed. <br />Deliverables: <br />• Bid Documents <br />• Proof of Advertisement <br />• Award of Contract <br />• Notice to Proceed <br />Task 10: Construction Administration <br />This task includes managing contractor submittal review, answering requests for information, and issuing <br />work directives. A full-time engineering construction observer will be on site for the duration of the project. <br />Construction observer duties include documenting of pre -construction conditions, construction diary, <br />preparing change orders, addressing questions of contractors on site, reviewing/updating project schedule, <br />reviewing contractor log submittals and pay requests, forecasting cash flow, notifying contractor if work is not <br />acceptable. Upon completing the project, the DWR Certificate of Project Completion and record drawings will <br />be provided to DWR. <br />Deliverables: <br />• DWR Certificate of Project Completion <br />• Record Drawings <br />Task 11: Construction <br />11 (a): Mobilization and Demobilization shall include preparatory and clean up operations including, but not <br />limited to, those necessary for the movement of personnel, equipment, materials and incidentals to and from <br />the project site, securing a temporary construction yard, providing a temporary field office facility, dust control <br />and maintaining the site in a safe and orderly manner during construction. <br />This item also includes the costs incurred for securing bonds, insurance, financing, permits and licenses. The <br />work under this item shall also include final project close-out and cleanup operations, including, but not limited <br />to, the work necessary for the removal of equipment, supplies, incidentals and debris, cleaning the site of all <br />soils and construction debris, correction of minor deficiencies in the work and for all other work required by the <br />City. <br />11 (b): Construct approximately twelve (12) granular activated carbon (GAC) vessels (approximately 10-foot <br />diameter and 20-feet high), approximately four (4) ion exchange treatment vessels (12-foot diameter and off <br />sufficient height to accommodate 378 cubic feet of resin expanding up to 25%), sodium hypochlorite <br />prefabricated metal chemical building, brine maker system, an approximately 50,000 gallon water recovery <br />storage tank and water recovery pump, yard piping, piping between well sites (approximately 4,700 linear <br />feet), brine discharge pipeline, electrical upgrades, and instrumentation and control integration as identified on <br />the plans and within the project specifications. <br />