My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AGENDA PACKET_2021-10-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
10/19/2021 Regular and Special
>
AGENDA PACKET_2021-10-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2021 3:40:52 PM
Creation date
10/18/2021 3:37:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
10/19/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
518
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Understanding of Need / Scope of Work <br />City of Santa Ana 3-5 <br />Pavement Management Program Update <br />We welcome staff members from the City of Santa Ana to join our surveys. All pavement data <br />will be entered into the City’s current StreetSaver licensed software. All items listed above will <br />be maintained by our staff for the duration of this project. <br />Data management will be performed in-house at our Oceanside office. At the completion of the <br />project, the StreetSaver database will be verified and Bucknam will ensure that it is accessible <br />within the City’s information services/communication network. <br />3. Section Distress and PCI Reporting <br />Once inspections are completed, we will generate a draft Pavement Condition Index (PCI) <br />Report for City staff to review. <br />PCI reports will include the necessary data listed within the Countywide Pavement Management <br />Program, Guidelines Manual; Chapter 3 (Agency Submittals). <br />At a minimum, the Santa Ana Pavement Condition Index (PCI) Report will include: <br /> Present condition index per segment, per rank, per maintenance zone and citywide <br /> Present condition of segments and future performance for the next seven years based <br />on performance prediction modeling and local conditions <br /> Identify the form, condition and causes of pavement failure (if possible) <br />Deliverable: Citywide draft PCI report, Pavement segment data required within Chapter 3 <br />PMP Guideline Manual (OCTA) <br />TASK 2.3: Customize Database and Maps <br />The City has requested that customized maintenance & rehabilitation (M&R) treatments be <br />added to StreetSaver in order to track M&R progress (i.e. 2” ARHM over 3/8 ARAM, over 2” AC <br />over native). Bucknam will add this tracking field to the Decision Tree and Work tracking tools <br />within StreetSaver. Additionally, Bucknam will work with StreetSaver development staff (Mr. <br />Dave Baker and other key Devmecca staff) to coordinate the preparation of a Santa Ana Custom <br />Report that will include the following data fields: <br />Furthermore, the City has requested that for the preparation of up to five custom maps for <br />presentation to upper management/City Council; Bucknam will coordinate with Devmecca and <br />StreetSaver support staff to publish the draft and final map products. <br />City Council 18 –37 10/19/2021
The URL can be used to link to this page
Your browser does not support the video tag.