My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AGENDA PACKET_2021-10-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
10/19/2021 Regular and Special
>
AGENDA PACKET_2021-10-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2021 3:40:52 PM
Creation date
10/18/2021 3:37:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
10/19/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
518
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Understanding of Need / Scope of Work <br />City of Santa Ana 3-7 <br />Pavement Management Program Update <br />Demonstration of effectiveness of several M&R strategies including preventive, <br />recycling alternatives, high-density mineral bonds and surface/base reconstruction <br />Scheduling with the City’s major CIP projects (water, sewer, etc.) ; <br />Budgetary recommendations that satisfy OCTA Local Match Reduction guidelines; <br />Future routine maintenance needs based on projected deterioration rates; <br />Renewed Measure M and AHRP objectives and improving citywide weighted PCI <br />The primary emphasis of this task is to maximize the scheduling of street maintenance using the <br />most cost-effective strategies available and taking into account a life-cycle cost analysis. <br />A working “draft” Final Report will be generated for City staff to review. The report will include <br />an executive summary, the PCI Report as well as draft budgetary findings and <br />recommendations. <br />Deliverable: Two copies of the Draft Pavement Management Program Report <br />TASK 2.5: Final Report - OCTA Compliance Reports / Citywide CIP Report <br />Through our previous project experience with the City; internal staff has developed a <br />comprehensive, reliable PMP report that is compliant with OCTA and internal needs. If <br />necessary, Bucknam will deliver the Final Report to the City which will be essential for staff <br />reference and use as well as presented in a way that is beneficial for elected officials/upper <br />management. <br />This report will assist the City in complying with OCTA and its most recent Countywide PMP <br />Guideline requirements. The report will be prepared in a format that uses the information <br />delivered by StreetSaver in conjunction with the information and analysis performed by our <br />team. The report will also provide the City with information on: <br /> Current inventory and pavement conditions indices (PCI) for all road classes <br /> Projected annual rehabilitation programs for street maintenance for a 7-yr period <br />(ARTERIAL and LOCAL Forecast Maintenance Reports) that show the largest return on <br />investment and acceptable levels of service <br /> Modeling and comparison of budget scenarios typically include: <br /> Maintenance required to complete all streets within 7-years <br /> Current / Actual budget projection (citywide approach) <br /> 7-year CIP projection budget for OCTA submittal requirements <br /> Final Local Match Reduction budgetary models / results <br /> Strategies and recommendations for the City’s AHRP, SB1, Measure M and <br />maintenance programs and procedures, including a preventative maintenance <br />schedule <br /> Supporting documentation required by OCTA <br /> A detailed breakdown of deferred maintenance (backlog) <br />City Council 18 –39 10/19/2021
The URL can be used to link to this page
Your browser does not support the video tag.