My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AGENDA PACKET_2021-10-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
10/19/2021 Regular and Special
>
AGENDA PACKET_2021-10-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2021 3:40:52 PM
Creation date
10/18/2021 3:37:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
10/19/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
518
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Relevant Project Experience <br />City of Santa Ana 4-2 <br />Pavement Management Program Update <br />Citywide Pavement Management Program Update <br />City of San Juan Capistrano (2013-2021) - StreetSaver <br />Mr. Joe Parco, City Engineer – (949) 443-6353 <br />32400 Paseo Adelanto, San Juan Capistrano, CA 92675 jparco@sanjuancapistrano.org <br />Over the past eight (8) years, our Project Manager (Mr. Peter Bucknam) has overseen/managed <br />four PMP projects for the City of San Juan Capistrano. In this span of time the City has increased <br />their overall PCI from the mid-60’s to the mid-70’s and has been able to sustain the PMP at a <br />high-level of condition. <br /> <br />Initially, the City utilized MicroPAVER software to manage the PMP; through Bucknam’s 2015 <br />project San Juan converted to StreetSaver. Bucknam has assisted RSM with three additional <br />StreetSaver / OCTA deliveries since 2015. <br />Citywide Pavement Management Program <br />City of Fountain Valley (1998-2022) - MicroPAVER <br />Mr. Temo Galvez, Deputy Director of Public Works / City Engineer – (714) 593-4517 <br />10200 Slater Avenue, Fountain Valley, CA 92708 (temo.galvez@fountainvalley.org) <br />Mr. Peter Bucknam has managed the City of Fountain Valley’s pavement management program <br />for over twenty-four (24) years and is current beginning the 2021-22 annual update for <br />MPAH/Locals for Measure M2 compliance. <br /> <br />Over the twenty-two years Mr. Bucknam has <br />overseen fourteen phases of pavement survey, <br />built the City’s Pavement-GIS layer and assisted <br />the City in accomplishing the overlay of more <br />than 90% of the City’s arterial network. Our <br />team assisted the City in implementing an <br />Intranet ArcServer Intranet GIS to assist the City <br />in managing all it GIS assets. <br /> <br />Our firm converted all pavement data from <br />CarteGraph to MicroPAVER (2005) based on the <br />use of the program from surrounding agencies <br />and its integration into the City’s GIS Intranet <br />program. <br /> <br />Residential maintenance zone management is <br />now the focus of the program where our project <br />team is performing survey, coring and the reorganization of the City’s slurry/cape seal zones to <br />create a more attainable, proactive residential maintenance program. Additionally, our staff has <br />performed a citywide arterial and collector pavement management study, sign, catch basin, and <br />curb marking inventory for the City using the Digital Roadway Imaging shown in our scope of <br />City Council 18 –44 10/19/2021
The URL can be used to link to this page
Your browser does not support the video tag.