My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AGENDA PACKET_2021-11-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
11/02/2021 Regular and Special
>
AGENDA PACKET_2021-11-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2021 1:58:52 PM
Creation date
11/2/2021 1:58:05 PM
Metadata
Fields
Template:
City Clerk
Date
11/2/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TS.660Sjudifz!Xbufs!Jnqspwfnfou!Qspkfdu! <br />Dpotusvdujpo!Nbobhfnfou!'!Jotqfdujpo!Tfswjdft <br />C/!Dpousbdu!Bhsffnfou!Tubufnfou <br />Berg & Associates, Inc. takes no exception to any and all provisions contained in the Agreement, <br />Attachment 2, found in the RFP Appendix. <br />D/!Gjsn!'!Ufbn!Fyqfsjfodf <br />D/2/!Gjsn!Fyqfsjfodf <br />Berg & Associates, Inc. (Berg), is a Woman-Owned (WBE), Disadvantaged <br />(DBE), Small Business Enterprise (SBE), providing management and <br />inspection of underground and overhead utilities, water pipelines, storm <br />drains, and pump stations since 1980. From grade separations to park <br />projects, nearly all of our projects involve utility relocations. We managed <br />storm drain projects for the Alameda Corridor Transportation Authority <br />including the Anaheim Street Storm Drain which consisted of large <br />diameter, 84-inch, 72-inch, and 48-inch storm drainpipe. The drain was <br />constructed within the City of Los Angeles using micro-tunneling methods <br />and access to adjacent properties and ground water management and <br />removal of contaminated soil and water was required. <br />We’ve also constructed numerous pump stations including the New Dock <br />and Henry Ford Pump Station for the Port of Los Angeles. The four-pump <br />facility, with two operational and two standby Flyght pumps, serves as a wet <br />of electrical components and the below-grade concrete structure required <br />substantial excavation and shoring. <br />Recently, Berg has installed thousands of feet of waterlines for cities <br />Project Management <br />like Santa Monica, Torrance, and El Segundo. These project locations <br />Resident Engineering <br />Quality Assurance Inspection <br />restaurants, requiring minimized noise interference, continued public <br />Project Controls <br />Compliance Documentation <br />We have an impressive track record of successful coordination and <br />Constructability & Bidability <br />experience working with permitting and regulatory agencies such as the Site & Permit Review <br />Schedule Review <br />US Army Corps of Engineers, the California Regional Water Quality Control <br />PS&E Review <br />Board (RWQCB), State Water Resources Control Board, the Orange <br />Federal, State, Labor and <br />County Flood Control District, and the US Environmental Protection <br />Environmental Compliance <br />Utility Coordination <br />Railroad Coordination <br />Federally-funded Projects <br />Caltrans Oversight Projects <br />Local Assistance Projects <br />Zfbs!Gpvoefe <br />Hsfbu <br />Mpdbm <br />1980 <br />Gjobodjbm <br />Ufbn <br />Dpoejujpo <br />Nfncfst of Industry, Long Beach, La <br />Quinta, San Pedro, CA <br />Xf!ibwf!mpdbm-!dsptt.usbjofe! <br />Op!cbolsvqudz-!mjujhbujpot-!! <br />Fnqmpzfft <br />tubgg!sfbez!up!qspwjef!b!sbohf!pg! <br />41 <br />tfswjdft!gps!uif!Djuz/ <br />Cfsh!'!Bttpdjbuft-!Jod/! <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.