My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AGENDA PACKET_2021-11-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
11/02/2021 Regular and Special
>
AGENDA PACKET_2021-11-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2021 1:58:52 PM
Creation date
11/2/2021 1:58:05 PM
Metadata
Fields
Template:
City Clerk
Date
11/2/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TS.660Sjudifz!Xbufs!Jnqspwfnfou!Qspkfdu! <br />Dpotusvdujpo!Nbobhfnfou!'!Jotqfdujpo!Tfswjdft <br />!!Dppsejobujpo!xjui!PDUB <br />OCTA is procuring easements on both sides of the SR-55 with Western Exterminator and RICOH. The <br />affects the start of the two casing crossings. Coordinating with OCTA to determine the earliest start date <br />OCTA is coordinating with Caltrans for the SR-55 Widening Project; with OCTA procuring the CM and <br />Caltrans procuring the construction contractor. The SR-55 project is to be completed between the two <br />phases of work on the City’s SA-7 Pressure Reducing Facility. Per the RFP, we are to assume a 12-month <br />construction period. It is important to closely coordinate with OCTA and their CM team to ensure the <br />Caltrans contractor is aware when the area will be ready for them to begin relocation of the 8’ x 4’ RCB <br />and for us to be aware, well in advance, of when the Caltrans contractor will have completed their work <br />before turning over the area and when receiving it back. Photos and videos will be taken in both instances <br />to document the condition. Both events would be required to be included on the City contractor’s CPM <br />schedule. <br />!!Bewbodf!Opujdf!pg!Tivuepxot! <br />Sjudifz!Tusffu!Xbufs!Nbjo;!The line in Ritchey St. is a large water main which provides water service and <br />to the City (SA-7 Facility) and local businesses are critical to good relationships with 3rd parties and <br />contractor’s CPM schedule. Personal contact with each business by the CM team is imperative. City <br />TB.8!Gbdjmjuz;!Critical to the City of Santa Ana’s water operations and per City requirements, this facility <br />can only be shut down for 7 consecutive calendar days. The CPM schedule would include pipe/electrical <br />installation, testing/commissioning, and would be monitored closely to ensure no time slippage. To ensure <br />the shutdown is completed within the required 7-day period, the contractor would be required to submit a <br />Testing/Commissioning Procedures submittal and a 7-Day Shutdown Activity submittal. <br />!!Vujmjuz!Dppsejobujpo! <br />As noted in the discussion regarding concrete encasement for pipe angle points, potholing of the known <br />potholing the known utilities, the CM team will ensure the contractor contacts DigAlert to mark utilities in <br />the entire footprint of the Project to ensure the designer did not miss any or that none were added after <br />design. The contractor will pothole the various tie-in points to ensure the horizontal/vertical alignment is <br />!!!UDF!Nbobhfnfou <br />TCE usage activities. Once the Project has commenced and schedules are known, the CM team will <br />ensure that both OCTA and the TCE owners (Western Exterminating and RICOH) were aware of the dates <br />and the work activities that will be occurring. These dates will be checked each month for discussions <br />Cfsh!'!Bttpdjbuft-!Jod/! <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.