My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AGENDA PACKET_2021-12-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/21/2021 Regular
>
AGENDA PACKET_2021-12-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 8:23:11 AM
Creation date
12/17/2021 1:35:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
12/21/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1071
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
projected schedule for completion. <br />CEQA & NEPA processes have been completed and the City is in the final stage of the permitting <br />process. <br />19. Please briefly describe the necessary construction/implementation for this project. <br />The construction components include the following: <br />1. Rehabilitate Well. (chemical, mechanical, electrical). Currently well is in buried <br />vault. Project would raise the well head to meet current Dept. of Public Health <br />recommendations. (Well casing, tubes, etc. will need to be constructed to raise the well head <br />to grade.) <br />2. Discharge piping. Construct approximately 3250 lineal feet of new pipeline to <br />convey flows from Well 32 to Garthe Reservoir. <br />3. New Pumping Equipment (May included: pump and motor, piping, valves, <br />disinfection, monitoring equipment. <br />4. Electrical Equipment Replacement (May include switchgear, control panel, Variable <br />frequency drive, telemetry, lighting, programming, etc.) <br />5. Building Modifications. (May include concrete slab, masonry walls and foundation, <br />sound attenuation.). <br />20. Please complete the schedule below for the project. Projects must be complete by March 31, <br />2026, to allow time for final invoice processing and retention payment before the State funds <br />expire on June 30, 2026. Project administration should end at least three months after <br />construction. <br />Categories <br />Start Date <br />End Date <br />(a) <br />Project Administration <br />1/1/2021 <br />8/1/2024 <br />(b) <br />Land Purchase / Easement <br />NA <br />NA <br />(c) <br />Planning/ Design / Engineering / Environmental Documentation <br />3/1/2021 <br />1/31/2022 <br />(d) <br />Construction/ Implementation <br />4/1/2022 <br />8/1/2024 <br />City Council 36 — 24 12/21/2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.