Laserfiche WebLink
Exhibit 1 <br /> 5.3.3 Fire Prevention Inspection <br /> Events that require street closures, the assembly of 50 or more <br /> people, cooking, open flame, use of pyrotechnics or fireworks, a <br /> change of building use (i.e. a warehouse use for an assembly space), <br /> electricity or temporary membrane structures (tents or canopies), <br /> and a separate permit may be required from the Orange County Fire <br /> Authority (OCFA). As part of the permit requirements, onsite stand- <br /> by and inspection services may be required due to the size, <br /> complexity and/or unique safety issues regarding the activities <br /> associated with the proposed event. Inspection fees may apply. <br /> 5.3.4 Traffic Control Plan and Parking <br /> Event producers requiring street closures and traffic modifications <br /> that pose a significant impact to vehicular traffic must have an <br /> approved traffic control plan created by a licensed and qualified <br /> traffic control company. All traffic plans are subject to final approval <br /> by the City's Traffic Engineer and the SAPD. Events taking place in <br /> a portion of a parking lot or alley are also subject to traffic control <br /> plans by a traffic control specialist and must obtain final approval by <br /> the City's Traffic Engineer and the Santa Ana Police Department. <br /> In the event that water filled traffic barriers (k-rails) are required, it is <br /> the responsibility of the event producer to obtain the k-rails and a <br /> water truck capable of filling the k-rails to ensure the barriers <br /> effectiveness. <br /> The Public Works Agency requires the use of water filled K-rail when <br /> the street or alley being closed or any of the two end of the block <br /> streets are classified larger than a residential street, per The City of <br /> Santa Ana's Master Plan of Streets and Highways or whenever <br /> Traffic Engineering staff feel there's the potential for a safety hazard <br /> to occur. <br /> In the event that water filled K-rail is required, it is the applicant's <br /> responsibility to ensure that the traffic control company is able to <br /> provide the water truck service necessary to completely fill all <br /> required water filled K-rails. <br /> 5.3.5 Stages and Other Temporary Structures <br /> Separate building permits may be required for stages and other <br /> temporary structures such as platforms and grandstands/bleachers <br /> that measure over 5 feet 9 inches in height. Applicants shall submit <br /> the building permit applications and plans no less than one month <br /> prior to their event to allow sufficient time for review and issuance of <br /> the permit. <br /> 5.3.6 Temporary Signage Permits <br /> SAMC Sec. 41-814 et seq. and Citywide Design Guidelines contain <br /> regulations and specifications of signs that may be located on private <br /> stalling <br /> City Council 7 3 �— 14 1/18/2022 <br />