Laserfiche WebLink
E. Relevant Project Experience <br /> Arvin Community Services District 2021 <br /> Project: Arsenic Mitigation Phase II <br /> (4) PLC Control Panels, Instrumentation, SCADA, PLC & HMI Programming for the integration of 7 <br /> Remote Well and Booster Station sites. <br /> Contract Amount: $ 328,633 Contact P&J Electric 661-822-6217 <br /> 1 • <br /> Metropolitan Water District <br /> Project: F. E. Weymouth Water Treatment Plant Chemical Upgrades 2019 <br /> (27) RTU Termination and Communication Cabinets, Chemical Tank Fill, Pump Control, Alarm, Valve <br /> Control and Safety Shower Control Panels and Instrumentation. <br /> Contract Amount: $364,976.00, Contact: Hobbs Bannerman 310-212-6500 <br /> Los Angeles <br /> Department of <br /> �WP water&Power <br /> Los Angeles Department of Power and Water <br /> Project: Elysian Reservoir Quality Improvement 2018 <br /> (17) Pump Control, PLC, Telecom, Hydraulic, Air Compressor and Sample Pump Control Panels and <br /> Instrumentation. <br /> Contract Amount: $470,928.00, Contract: CSI Electric 562-946-0700 <br /> 7-" <br /> The City of Paso Robles <br /> Project: Wastewater Treatment Plant Upgrade 2017 <br /> (15) PLC, Chemical, Pump Control and Truck Unloading Control Panel, Instrumentation, SCADA, PLC & <br /> HMI Programming <br /> Contract Amount: $1,092,641.00, Contract: Southern Contracting 760-744-0760 <br /> Project: Wastewater Tertiary Treatment Facilities 2019 <br /> (1) Control Logix PLC, Integration of UV Trojan PLC, Instrumentation, SCADA, PLC & HMI Programming <br /> Contract Amount: $232,889.00, Contract: Electricraft 805 -544-8224 <br /> County of Ventura Public Works —Active Client <br /> Various Pump Station Control Panels: Greentree Booster Pump Station, Bradley Turnout Station, District <br /> 1 S&K Pump Station. <br /> Contact: Raul Ruiz 805-378-3043 <br /> F. References See Attachment 3 <br /> G. Fee See Cost Proposal in Separate Cover <br /> City Council 23 — 29 1/18/2022 <br /> 5of11 <br />