My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-01-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Agenda Packet_2022-01-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2022 5:15:24 PM
Creation date
1/12/2022 5:00:16 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
1/18/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1046
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana I Statement of Qualifications Water Resources Panel Building Services 1 5 <br /> Products and Services Offered <br /> Trimax is a"Turnkey"Solution Provider leveraging advanced programming software to create more efficient systems with <br /> increased visibility and oversight, including remote access. Our engineers are experts in PLC/PAC, HMI, SCADA and MES <br /> programming and integration. Combined with our skilled electrical design engineers and UL rated panel shop, Trimax <br /> possesses all the necessary tools to provide turnkey solutions for a variety of industries. <br /> Among some of the services we provide are PLC/PAC, HMI and SCADA programming, MES Development and ERP <br /> Integration,electrical engineering, UL panel shop,instrument calibration services,system start-up and training,CCTV and <br /> remote monitoring, maintenance and on-call contracts,field services and telemetry integration. <br /> Applicable License(s) and Certifications <br /> Trimax is part of the GE Solution Provider Program, Rockwell Automation Global Commercial Program, Schneider <br /> Electric Alliance Program,Siemens Software Integrator Program, Inductive Automation Ignition Certified,and currently <br /> in process for Wonderware InTouch and System Platform 2014 R2 Certification. Trimax Panel Shop carries the following <br /> certifications E133199 UL 508A Industrial Control Panels, E304786 UL 1203 Explosion Proof(XP) Panels, E305397 UL <br /> 698A Intrinsically Safe Panels (508A with Intrinsic Extensions). <br /> List of contracts in the last three years that were terminated prior to completion <br /> Trimax in its history, has never had a contract terminated prior to completion. Trimax is committed to delivering the <br /> client their systems as required per the specifications and contract documents. <br /> Project Mangement <br /> Trimax assigns a dedicated project manager for all services provided by the company. This allows a single reliable point <br /> of contact for the customer and provides an individual that has knowledge of all aspects of a project to ensure that the <br /> needs of the client are always met. While there may be multiple projects and service-related activities occurring <br /> simultaneously for a client we maintain a single project manager. That person is then best suited to evaluate the needs <br /> of completing requirements and allocate resources in the most efficient way possible. <br /> The project manager facilitates communications between all personnel involved on the project through weekly <br /> meetings. This is most important when multiple projects are underway. To keep constancy in the outcome across <br /> multiple sites the project manager makes sure that all parties are made aware of decisions made at a single location. If <br /> work includes interacting with or managing other contractors,the project manager tracks vital aspects of the project <br /> that must integrate clearly between all parties. This requires the preparation and management of documentation <br /> defining these interactions to make sure that requirements from all sides are specified and understood by everyone. <br /> Strong and open communications are required between Trimax engineers and many members of the district's staff to <br /> ensure that work performed best meets the needs of the district and operates as intended. Many times,this is achieved <br /> through meetings and/or workshops. While this is very positive for information transfer it also creates contrasting <br /> opinions. To mitigate this,we require one point of contact per project that is designated to make final decisions that <br /> are not formally answered through the RFI process. <br /> Resource Availability <br /> Trimax has a strong group of engineers with specialties in a wide range of fields associated with PLCs,SCADA, Networks, <br /> database&software development,and robotics. This allows for high level solutions to almost any problem. At the <br /> same time, it also provides flexible resource support to meet demanding needs. All the engineering staff is strong in the <br /> C�i�t��/, Council 23 — 66 1/18/2022 <br /> TRIMAJC 1 A TESCO CONTPOLS COMPANY Water and Waste Water Project Qualifications <br />
The URL can be used to link to this page
Your browser does not support the video tag.