Laserfiche WebLink
City of Santa Ana I Statement of Qualifications Water Resources Panel Building Services 1 7 <br /> UNDERSTANDING SCOPE OF SERVICES <br /> Each project is assigned a lead engineer that is responsible for all aspects of the work. To best utilize the abilities of the <br /> senior engineering staff Trimax has created a strong support structure including design engineers,drafters, instrument <br /> technicians, software developers and field service technicians. The lead engineer has these resources at his/her <br /> disposal to assist with project tasks allowing more of the engineer's time to be spent programming and commissioning <br /> systems. The senior engineer is solely responsible for all work and documentation performed. He/she is required to <br /> review and verify the product of all support work. The support staff allows for more efficient output from the senior <br /> engineer and the single point of accountability makes sure that the assistance is a tool and not a crutch. The support <br /> staff also acts as a review panel and secondary check to the senior engineer. <br /> This structure also ensures that when multiple programmers are working on a project there is a single direction and <br /> methodology. The senior engineer defines the breakdown of tasks and interaction between all programming before <br /> work begins. <br /> Trimax believes that detailed and accurate design at the beginning of a project saves far more time at the end of the <br /> work. This design must also account for possible future needs and expansion,so the result has the flexibility to meet <br /> ongoing requirements. <br /> Documentation is the key to accurate design,efficient work,a successful result,and maintainability. It produces a <br /> greater life cycle for the project. <br /> C�i�t��/, Council 23 — 68 1/18/2022 <br /> TRIMAJC 1 A TESCO CONTROLS COMPANY Water and Waste Water Project Qualifications <br />