My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-01-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Agenda Packet_2022-01-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2022 5:15:24 PM
Creation date
1/12/2022 5:00:16 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
1/18/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1046
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana I Statement of Qualifications Water Resources Panel Building Services 1 9 <br /> Raytheon Technologies Groundwater <br /> i Treatment Extraction System <br /> RAYTHEON Raytheon Technologies Corporotioi7, Fullerton, Cali forma <br /> TECHNOLOGIES <br /> CORPORATION <br /> REFERENCE <br /> Kevin Coons,PE <br /> Senior Professional Engineer w <br /> Engineering Analytics,Inc. <br /> (previously with Hargis+Associates, <br /> Inc.) Too <br /> 858.221.0264 <br /> KCoons@enganalytics.com A <br /> PROGRAM MANAGER , - <br /> Tony Rossi,PE - t. <br /> Engineering Manager <br /> Hargis+Associates,Inc. <br /> 858-410.7449 <br /> trossi@hargis.com Trimax partnered with Hargis+Associates for three major groundwater extraction <br /> DESIGN ENGINEER and treatment upgrade projects at the former Hughes Aircraft Company Facility <br /> Ross Horton,EIT in Fullerton,California.Trimax provided design services and manufactured a <br /> Staff Engineer verity of field control panels that communicate with groundwater extraction wells <br /> Ha rgis+Asso ci ate s,I c. <br /> and associated field instrumentation for pumping contaminated groundwater <br /> 858 3737649 from wells into various treatment systems that remove the contaminates before <br /> RHorton@hargis.com returning clean water back into the ground for aquifer storage. <br /> CONTRACTS Groundwater Extraction and Treatment System Expansion <br /> $182,134 total,Hargis+Associates Trimax designed,fabricated,and tested the main PLC control panel to operate <br /> and control a groundwater extraction and treatment(GET)system at the former <br /> DATES Hughes Aircraft Facility.The main PLC panel operates and provides status to <br /> January 2014-Present sub-panels,extraction well pumps,transfer pumps,and communicate with the <br /> Trojan advanced oxidation process(A0P)system.Testing and start-up services <br /> EQUIPMENT AND included operation of all pumps and motors,valves,filtration systems,UV-lighting, <br /> SOFTWARE carbon absorption system,storage tank control and all extraction well controls. <br /> • Wondervware HMI Trimax tested all interlocks,shut-down and emergency systems to confirm <br /> • Ignition 5CAC7A <br /> successful system operations. <br /> . Allen-Bradley PLCs The challenges of integrating multipliable ground-well pumps scattered <br /> • Ethernet/Fiber optic throughout the Raytheon site and vicinity far this major environmental cleanup <br /> included communicating control through fiber and wireless to the extraction <br /> wells,integrating the water delivery systems,and manufacturing the water <br /> treatment packages. <br /> After a successful and on-schedule plant testing,startup,and commissioning, <br /> Trimax provided deliverables including Loop Diagrams and Control <br /> Panel Drawings with PLC Control Code. We continue to provide ongoing <br /> services for upgrades and modifications to the plant controls. <br /> C�i�t��/, Council 23 — 70 1/18/2022 <br /> TRIMFIIC 1 A TESCO CONTPOLS COMPANY Water and Waste Water Project Qualifications <br />
The URL can be used to link to this page
Your browser does not support the video tag.