My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-01-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Agenda Packet_2022-01-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2022 5:15:24 PM
Creation date
1/12/2022 5:00:16 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
1/18/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1046
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana I Statement of Qualifications Water Resources Panel Building Services 1 14 <br /> Sub-Regional Water Reclamation Plants <br /> Victor Volley Wastewater Reclamation Authority(WWRA), <br /> Hesperio and Apple Valley, Colifornio VICTOR <br /> This$65.8 million project constructed two new individual water reclamation WASTEWATER <br /> plants(WRPs),each with capacity of one mgd,located in the City of Hesperia RECLAMATION <br /> and in the Town of Apple Valley.These new plants treat a portion of the local AUTHORITY <br /> wastewater,but all solids and the remaining wastewater balance are treated by <br /> the main treatment plant in Victorville.The project also modified the existing <br /> Apple Valley lift station,an existing percolation pond,and constructed a new,off- <br /> site Hesperia lift station. REFERENCE <br /> Mr.Latif Laari <br /> Integrated communications from specific process systems,like Fine Screens,MBR Business Applications Manager <br /> and UV systems,were installed at both new plants,with a total of 13 PLCs under 760.954.5083 <br /> the new Sub-Regionals network.After programming,Trimax integrated each Ilaari@vvwra.com <br /> of these specific process systems into the SCADA System and provided control <br /> system commissioning services including factory acceptance testing(FAT)and DESIGN ENGINEER <br /> system start-up.TRIMAX was specifically responsible for: Carollo Engineers <br /> • Design and fabrication of UL control panels: 4600 East Washington Street <br /> Suite 500 <br /> ) 7control panels Phoenix,AZ85034 <br /> ) 4 electrical panels <br /> CONTRACT <br /> ) 4 communication and network panels $2,487,471 <br /> • Provision and calibration of 215+instruments and 14 surveillance cameras. <br /> DATES <br /> • Programming of 7 Control Logix Allen Bradley PLC's. February 2017—May 2018 <br /> • Design and develop 7local HMI's using FactoryTalk View and Panel View. <br /> • Design,develop and integrate screens from the 7control panels in to EQUIPMENTANDSOFTWARE <br /> Wonderware SCADA software. <br /> • <br /> Programming included process,trending,reporting,and alarming. • Wonderware SCADA and <br /> Reporting <br /> • Field instrument calibration and loop checks. . Allen-Bradley PLCs and Panel <br /> • Project documentation including electrical drawings,loop checks,and View Plus Terminals(OITs) <br /> networking. . FactoryTalk View and Panel View <br /> +1000 <br /> Our history serving VVWRA includes: . Ethernet/Fiber Communication <br /> • 2017:Sub-Regional Reclamation plants. <br /> • 2018:SCADA Upgrade(complete system). <br /> • 2020:Regional Treatment plant,Phase 1 Control panels upgrade. <br /> C�i�t��/, Council 23 — 75 1/18/2022 <br /> TRIMFIIC I A TESCO CONTPOLS COMPANY Water and Waste Water Project Qualifications <br />
The URL can be used to link to this page
Your browser does not support the video tag.