My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-01-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Agenda Packet_2022-01-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2022 5:15:24 PM
Creation date
1/12/2022 5:00:16 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
1/18/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1046
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KDC Systems <br /> An EMCOR Company <br /> KDC Systems is committed to providing the highest quality services to City of Santa Ana.Our <br /> intention is to form a team specifically dedicated to supporting your design, project and <br /> support needs. <br /> 2.2. Key Personnel <br /> KDC Systems would assign the following team to support City of Santa Ana. Each team <br /> members anticipated time focused on Santa Ana is in parenthesis. <br /> Ed Kazimierski(3%) <br /> General Manager <br /> PRIMARY CONTACT <br /> Lukasz Niedoladlo(10%) Greg Eso(5%) <br /> Program Manager Engineering Mngr <br /> Horn Seng(6%) Tuan Le(5%) <br /> Panel Shop Foreman Lead Engineer <br /> Y <br /> Mohammad Toghoni I Geoff Scarp(10%) Eric Kosalka(10%) Mike Gomez(10%) <br /> Senior Engineer(10%)tl Engineer Engineer CAD Designer <br /> Our philosophy is to have a group of engineers who are familiar with a supported facility.All <br /> assigned Engineers will familiarize themselves with City of Santa Ana engineering standards <br /> and facilities.All team members are locally based and work out of our facility in Los <br /> Alamitos. <br /> See Resumes—APPENDIX A <br /> 2.3. Panel Fabrication <br /> KDC Systems operates a 4000 square foot, UL508A/UL-698 listed Panel Shop.This is <br /> adjacent to our headquarters in Los Alamitos. <br /> Page 17 <br /> City Council 23 — 111 - K0015fiffems <br /> An EMCOR Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.