My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-01-18
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
01/18/2022 Regular & Special SA
>
Agenda Packet_2022-01-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2022 5:15:24 PM
Creation date
1/12/2022 5:00:16 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
1/18/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1046
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KDC Systems <br /> An EMCOR Company <br /> This project is still in progress. Technologies being deployed include Wonderware <br /> System Platform, Wonderware Enterprise Historian, VMWare Virtualized Environment, <br /> Dell Servers, Modicon PLCs, Win911. KDC Systems is maintaining a Test Bed at our <br /> facility to support testing and debug. <br /> 4.3. Orange County Water District, Advanced Water <br /> Treatment Facility <br /> R <br /> 1 1!111 I 'un - - <br /> 1111#� _ ri111 iu <br /> Project Size $15.3M <br /> Years 2004— present (Initial project, Phase 2 expansion & Final expansion) <br /> Overview <br /> The Ground Water Replenishment System (GWRS) is the world's largest advanced water <br /> purification system for indirect potable reuse. The system takes highly treated <br /> wastewater that would have previously been discharged into the Pacific Ocean and <br /> purifies it. A three-step advanced treatment process is utilized. This process consists of <br /> microfiltration, reverse osmosis and the application of ultraviolet light with hydrogen <br /> peroxide. The process produces high-quality water that meets or exceeds all state and <br /> federal drinking water standards <br /> KDC Scope <br /> DeltaV Programming (Control Strategies, Operator Stations, Historian), Design and Build <br /> of 100+ UL-508A Control Panels and Local Operator Stations, Electrical Design, <br /> Instrumentation, Field Calibrations, Commissioning, Testing. <br /> _C616ouncil 23 - 118 8aO22 <br /> KDd bystems <br /> An EMCOR Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.