Laserfiche WebLink
KDC Systems <br /> An EMCOR Company <br /> discomfort to the thousands of daily travelers and commercial discomfort to LAWA who <br /> have commitments to their customer airlines. <br /> As the 'Balance of Plant' integrator we were required to interface with multiple <br /> equipment vendors. The airport is physically and organizationally dispersed. Every <br /> terminal has its' own systems and service contracts which made this a very difficult <br /> project to manage.Our schedules had to be constantly revised to ensure that specific <br /> modules were ready and tested to coincide with changing construction and installation <br /> schedules. <br /> KDC Systems met our customer's requirements through careful planning and <br /> coordination with all parties. <br /> 4.5. City of Santa Ana - Various Projects <br /> Well 21 , South Station Well Integration, Wells 16&33 <br /> Control Panels, SA-5 Vault Modifications, Walnut <br /> Pump Station, Cambridge Bypass, Santa Ana SA-7 <br /> Radio Repeater Panels & Well 20 Meter Integration <br /> 5. REFERENCES <br /> IRWD, Baker Water Treatment Plant <br /> Scott Toland, PE <br /> Senior Engineer, Baker WTP Construction Manager <br /> (949) 458-4200 Baker WTP direct <br /> (760) 822-3194 mobile <br /> toland@irwd.com <br /> Orange County Water District, AWTF/GWRS <br /> Jay Kalinowski <br /> Process Control and System Manager <br /> T- (714) 378-3250 <br /> jkalinowski@ocwd.com <br /> Cit ouncil 23 — 121 KD 8bystems <br /> An EMCOR Company <br />