Laserfiche WebLink
■ Basic Programming of PLCs, Festo <br /> ■ Intermediate Programming of PLCs, Festo <br /> ■ PLC Redundancy, Aryan Elmosanaat Training Center <br /> ■ Introduction to Industrial Profibus, Kian Control Engineering Co. Ltd. <br /> ■ Modbus, Aryan Elmosanaat Training Center <br /> ■ Introduction to Simatic WINCC (Siemens SCADA), Kian Control Engineering Co. Ltd. <br /> ■ Variable Frequency Drives, E and M <br /> ■ Introduction to EPLAN Electric, Kian Control Engineering Co. Ltd. <br /> ■ General Principles of Metrology & Calibration, Khat Ramz Co.Ltd. <br /> Recent Projects: <br /> ■ Gilead Clinical Flex Fill Line and Second Formulation Suite <br /> Instrument and panel design. In-Current <br /> PLC, HMI and SCADA programming. <br /> ■ Orange County Water District Ground Water Replenishment System <br /> Instrument and panel design. In-Current <br /> PLC, HMI and SCADA programming. <br /> ■ City of Santa Ana Well 16 and 33 SA-5. <br /> PLC and HMI programming. 2019 <br /> ■ Irvine Ranch Water District Michelson Water Recycling Plant Biosolids and Energy Recovery <br /> Facilities <br /> SCADA programming. 2019 <br /> ■ Edwards Air Force Base ACU and Aircraft Support Equipment Upgrades. <br /> PLC, HMI and SCADA programming, Commissioning, Startup. 2018 <br /> ■ Automation Plating Corporation Plating Line PLC Upgrade. <br /> PLC and HMI programming, Commissioning, Startup. 2018 <br /> ■ Water Replenishment District of Southern California Goldsworthy Desalter Expansion <br /> Commissioning, Loop check, FAT and PLC program modification. 2017 <br /> ■ Global Harvest Foods Mixing System. <br /> Panel Design, PLC and SCADA programming, Commissioning, Startup. 2017 <br /> ■ City of San Clemente Marblehead Coastal Urban Runoff System. <br /> PLC and HMI programming, Loop check and commissioning. 2017 <br /> ■ MWD Henry J. Mills WTP Industrial Wastewater Handling Improvement. <br /> Commissioning Plan, Instrument and control system training. 2017 <br /> ■ Western Riverside County Regional Wastewater Authority 14MGD Plant Expansion. <br /> Commissioning Plan for whole Plant. 2016 <br /> ■ Irvine Ranch Water District Baker Water Treatment Plant <br /> Control Panel FDT, Instrument Setup and calibration, Loop checks. 2016 <br /> ■ MWD Weymouth Water Treatment Plant. Oxidation and Ozonation Facilities. <br /> Instrument setup and calibration. Loop checks, Instrument training. 2015 -2016 <br /> City Council 23 — 130 1/18/2022 <br />