My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TRIMAX
Clerk
>
Contracts / Agreements
>
T
>
TRIMAX
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2024 1:47:39 PM
Creation date
1/28/2022 3:27:03 PM
Metadata
Fields
Template:
Contracts
Company Name
TRIMAX
Contract #
A-2022-009-02
Agency
Public Works
Council Approval Date
1/18/2022
Expiration Date
1/17/2025
Insurance Exp Date
2/1/2025
Destruction Year
2030
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana I Statement of Qualifications Water Resources Panel Building Services 1 7 <br />UNDERSTANDING SCOPE OF SERVICES <br />Each project is assigned a lead engineer that is responsible for all aspects of the work. To best utilize the abilities of the <br />senior engineering staff Trimax has created a strong support structure including design engineers, drafters, instrument <br />technicians, software developers and field service technicians. The lead engineer has these resources at his/her <br />disposal to assist with project tasks allowing more of the engineer's time to be spent programming and commissioning <br />systems. The senior engineer is solely responsible for all work and documentation performed. He/she is required to <br />review and verify the product of all support work. The support staff allows for more efficient output from the senior <br />engineer and the single point of accountability makes sure that the assistance is a tool and not a crutch. The support <br />staff also acts as a review panel and secondary check to the senior engineer. <br />This structure also ensures that when multiple programmers are working on a project there is a single direction and <br />methodology. The senior engineer defines the breakdown of tasks and interaction between all programming before <br />work begins. <br />Trimax believes that detailed and accurate design at the beginning of a project saves far more time at the end of the <br />work. This design must also account for possible future needs and expansion, so the result has the flexibility to meet <br />ongoing requirements. <br />Documentation is the key to accurate design, efficient work, a successful result, and maintainability. It produces a <br />greater life cycle for the project. <br />TRIMAXI4 =S-a CJ1VTRCL5-0n,+F4Nr and wa=c Water Proteet clual�;i_a,.ons <br />
The URL can be used to link to this page
Your browser does not support the video tag.