Laserfiche WebLink
Sample Project Schedule <br />Iteris has provided the following sample schedule as shown in Figure 3 for the recent Main Street RTSS Project. <br />Figure 3 — Proposed Project Schedule <br />1 1.0 Project Management (PI Phase) <br />20 <br />21 2.0 Data Collection <br />27 <br />28 3.0 Field Review and P5&E <br />33 <br />34 4.0 Corridor'Before' Studies <br />39 <br />40 .5.0 Signal Timing Optimization and Implementation <br />51 <br />52 6.0 Cni ridor'After' Studies <br />57 <br />58 7.0 Synchronization System Construction <br />fib <br />69 8.0 Operations Maintenance and Monitoring Phase <br />70 R.1 Project Management (OMM Phase) <br />97 8.2 Continuing Signal Timing Support <br />99 <br />10d 9.0 Project Report <br />101 9.1 Project Report (PI Phase) <br />106 9.2 Project Report (OMM Phase) <br />111 <br />112 10.0 Traffic Signal Mod elingSupport <br />318 days IMon 4/1/19 Iwed 6/17/20 I V <br />- <br />days ITue4/2/19 IMonfr/17/19 I <br />days I-rue4/2/19 IMon5127119 <br />days IFri 4/12119 IFri 6/7/19 <br />days ITue4/16/19 IMon3123/24 <br />days IMon 3/16/20 IFri 5/1/20 I I I W—* <br />days IMon 4/15/19 IMon 2/24/24 <br />543 days Mon 6/1/20 Wed 5/29/22 <br />541 days Wed 6/3/20 Wed 6/29122 <br />521 days Mon 6/1/20 Mon 5/30/22 <br />3 days Mon 4/27/20 Wed 6129122 <br />days Mon 4/27/20 Fri 5/29/20 <br />days Tue 5/31/22 IWed 6/29/22 <br />15 days Mon 4/15/19 Fri 5/3/19 I !7 <br />&nbsp; <br />Santa Ana, On -Call Transportation & Traffic Engineering Services (RFP No. 21-125) City Council Iteris, Inc. 130 <br />&nbsp;17 &ndash;&nbsp;89 <br />2/15/2022 <br />&nbsp; <br />