My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-02-15
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
02/15/2022 Regular
>
Agenda Packet_2022-02-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 12:57:10 PM
Creation date
2/9/2022 12:15:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
2/15/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EDUCATION <br />Bachelor of Arts, Geology <br />California State University, 2000 <br />AFFILIATIONS <br />American Public Works Association (APWA) <br />EXPERTISE <br />• Traffic Signal Design <br />• Street Lighting <br />• Roundabouts <br />• Bicycle and Pedestrian Facilities <br />• Construction Management <br />• Cost Estimating <br />FEHR�PEERS <br />4 <br />J <br />Mike ohnstone <br />Senior Engineering Technician <br />ABOUT <br />Mike Johnstone is a Senior Technical Specialist with over 19 years of experience, and <br />currently manages a number of traffic signal and lighting design projects. Mr. <br />Johnstone`s experience includes preparing plans, specifications and estimates for the <br />design of traffic signals, highway lighting and sign illumination, street lighting, ramp <br />metering, and signal interconnect systems, signing and striping plans; as well as <br />roundabout concept designs. Mr. Johnstone has completed projects in the cities of <br />Los Angeles, Santa Monica, West Hollywood, and Anaheim. He is proficient with <br />AutoCAD and Microstation, the latest drafting software programs,- AGI32, lighting <br />analysis software; AutoTurn, vehicle turning analysis software, and SignCAD, and sign <br />panel design software. <br />PROJECT EXPERIENCE <br />Citywide Major Street Rehabilitation (Pomona, CA) <br />Fehr & Peers prepared roadway improvement plans For the Active Transportation <br />Program (ATP) and Americans with Disabilities Act (ADA) improvements, which are <br />part of the major street rehabilitation project within the City of Pomona. The locations <br />for these improvements include Holt Avenue and Hamilton Boulevard, Halt Avenue <br />and Towne Avenue, Holt Avenue and San Antonio Avenue, San Bernardino Avenue <br />and Indian Hili Boulevard, and San Antonio Avenue at Barfield E€ementary School. The <br />project constructed curb extensions, high visibility crosswalks as well as upgraded <br />signal equipment to including accessible pedestrian signals, countdown pedestrian <br />signal heads, signal poles, vehicle heads for the pedestrian improvements. <br />Construction was completed in 2018. Mike was the Project Manager and Lead <br />Transportation Designer on the team. <br />Colorado Esplanade and Downtown Plaza Design (Santa Monica, CA) <br />The Coioraclo Esplanade, from 4th Street to Ocean Avenue, is a designed to connect <br />the Downtown Expo Light Rail station, the Santa Monica Pier, the Civic Center, <br />Downtown District, and Tongva Park. The project converted Ocean Avenue from a 2- <br />way street to a 1-way street, providing multiple travel modes access from the light rail <br />station to the Santa Monica Pier via a 2-way cycle track and pedestrian promenade. <br />Fehr & Peers assisted the design team and city staff with refinement of the Schematic <br />Design, Design Development, and prepared final project plans and specifications. <br />Fehr & Peers prepared plans and specifications for the signal modifications fiom 4"' <br />City Council 17 — 172 2/15/ b ` &PEERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.