My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-02-15
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
02/15/2022 Regular
>
Agenda Packet_2022-02-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 12:57:10 PM
Creation date
2/9/2022 12:15:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
2/15/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EDUCATION <br />B.A. (Environmental Analysis and Design), <br />University of California, Irvine, CA, 2000 <br />PROFESSIONAL REGISTRATIONS <br />Certified Planner, American Institute of <br />Certified Planners #019993 <br />PROFESSIONAL AFFILIATIONS <br />American Planning Association <br />Association of Pedestrian and Bicycle <br />Professionals <br />William Delo <br />AICP <br />Principal -in -Charge <br />Director IBI Group <br />Mr. Delo is a Director of IBI Group and a Transportation Planner <br />with over 20 years of experience in transportation planning, multi - <br />modal planning, active transportation, and traffic engineering. Mr. <br />Delo is an experienced project manager. His transportation planning <br />experience includes the preparation of multi -modal plans, complete <br />streets plans, first/last mile plans, and conceptual design efforts. <br />Relevant Experience <br />OCTA Active Transportation Plan (OC Active), Orange County, CA <br />Project Manager for IBI Group's effort to prepare the first ATP for Orange County. <br />Project elements included identification of pedestrian priority areas, regional <br />bikeways, and design toolboxes. <br />Santa Ana General Plan Circulation Element, Santa Ana, CA <br />Mr. Delo was the project manager of this effort to update the General Plan Circulation <br />Element. The update focused on rethinking the city's transportation network, <br />focusing on moving people rather than cars, and making city streets safer for all <br />users of the transportation system. <br />IBC Trails Feasibility Study, Irvine, CA <br />Mr. Delo was the Project Manager of this feasibility study, examining the potential <br />for implementation of multi -use trails along rail and flood control channels. Project <br />included extensive community outreach for both residents and business in the Irvine <br />Business Complex. <br />Purple Line First/Last Mile Plan, Los Angeles, CA <br />Project Manager for this project involving the planning and community engagement <br />efforts for bicycle and pedestrian first/last mile improvements at seven subway <br />stations in West Los Angeles. <br />Agua Caliente Section 14 Complete Streets Plan, Palm Springs, CA <br />Project manager for this study focused on the development of a Complete Streets <br />plan and vision for the Section 14 Master Plan. <br />VTA Light Rail Station Access Studies, San Jose, CA <br />Project manager for two light rail station access studies in San Jose. Examined <br />strategies to improve bicycle and pedestrian access to the Blossom Hill and Tamien <br />stations. <br />Michigan Avenue Neighborhood Greenway, Santa Monica, CA <br />Mr. Delo was IBI Group's task lead for the conceptual design element for the <br />neighborhood greenway project. <br />SR-41/Ave 9 Sustainable Transportation Study, Fresno, CA <br />CityCouncil g <br />recommendations for the ,venue 9 corridors in Fresn��a� ��r Counties. <br />IBI GROUP ON -CALL TRANSPORTATION AND TRAFFIC ENGINEERING SERVICES - RFP NO. 21-125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.