Laserfiche WebLink
KDC Systems <br />An EMCOR Company <br />case of emergencies (eg. Security patches) we will notify City of Santa Ana and <br />expedite the installation. <br />Firmware upgrades will be applied as agreed with City of Santa Ana. <br />3. UNDERSTANDING SCOPE OF SERVICES <br />3.1. Panel Building Services <br />We will construct and furnish industrial control panels and all work will be in compliance <br />with the National Electric Code (NEC), Underwriters Laboratories (UL) 508A (standard <br />for the construction of industrial control panels) and UL508 (standard for safety for <br />industrial control equipment). We will be responsible for the procurement of all <br />material and fabrication of control panels on provided drawings and/or functional <br />specifications. <br />Prior to commencement of panel building services, we will assess the project and <br />provide a submittal to the City containing proposed equipment and components as well <br />as project schedule for the construction of the panels. We will provide separate quotes <br />for City's review and approval. Once a notice to proceed is received, we will commence <br />procurement and fabrication activities. <br />3.2. Factory Acceptance Test <br />Any control panel fabricated by KDC systems is inspected by our engineers for <br />compliance to drawings by verifying interior/exterior layout with the design. We confirm <br />all items on bill of material have been provided and installed per specification. <br />We verify all fuse types and rating and ensure fuses are not blown by continuity testing. <br />We will verify all wire sizes, colors, labels and terminal numbers. <br />For power distribution circuits we open all circuits before power up and close circuits in <br />sequence after proper wiring, fuses and voltages have been confirmed. <br />Page 110 <br />KDC Systems <br />An EMCOR Company <br />