Laserfiche WebLink
Dynalectric <br />KDC Systems <br />EMCOR Companies <br />Tuan Le, P.E. <br />Senior Applications Engineer <br />15 years with Dynalectric / KDC Systems <br />Education <br />• Bachelor of Science, Mechanical Engineering, California State Polytechnic University, Pomona. <br />• California Registered Professional Engineer, Mechanical, 1995, #M29864 <br />Selected Project Experience <br />IRWD Biosolids and Energy Recovery Project (2017-2020) <br />Application: Biosolids and Energy Recover Facilities <br />PLC: Schneider Modicon Quantum, M340 <br />Tasks: Lead team for programming and configuration of the Process Control System for new <br />plant, including submittals, development, configuration, and testing of PLC programs, <br />HMI templates and instances, graphics, historian, reports, and alarm dialer; setup and <br />testing of redundant SCADA servers running on VMware ESXi; integration and testing of <br />packaged equipment skids; field startup, device commissioning and acceptance testing. <br />Orange County Water District Initial Expansion of GWRS (2011-2015) <br />Application: Expansion of existing MF, RO, UV and supporting systems to increase plant water <br />production from 70MGD to 100MGD. <br />DCS: Emerson DeltaV <br />Tasks: Software detail design, programming and commissioning of MF, RO and UV systems; <br />control network and control panel power load calculations; setup and testing of motor - <br />operated valves, variable frequency drives, power monitors, and various Foundation <br />Fieldbus and DeviceNet devices; integration and testing of packaged equipment skids; <br />field startup, device commissioning and acceptance testing. <br />LAX Central Utility Plant (2011-2015) <br />Application: Central Utility Plant SCADA system. <br />PLC: A-B ControlLogix communicating with various vendor systems. <br />HMI/01T: Wonderware ArchestrA System Platform, InTouch. <br />Tasks: SCADA System design and configuration for central utility plant and building automation <br />system; setup alarming, historical data collection and reporting. <br />LADWP Owens Lake Dust Mitigation, Phase 7 (2008-2010) <br />Application: Shallow flooding 27 square miles of dry lake bed to mitigate dust <br />PLC: A-B SLC and ControlLogix miles apart communicating via radio network <br />HMI101T., GE iFIX, A-B PanelView <br />Tasks: Project engineering, programming and commissioning; control panel design and power <br />load calculations; software and hardware detailed design; developing FAT, SAT, training <br />and O&M manual documentation; software and graphics development, and submittals; <br />setup historical data collection and reporting. <br />Orange County Water District AWTF and GWRS (2005-2008) <br />Application: Purification of treated waste water using microfiltration, reverse osmosis and ultraviolet <br />light; product water is used to keep ocean out of groundwater basin and to replenish <br />drinking water supplies. <br />