My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KDC SYSTEMS (2)
Clerk
>
Contracts / Agreements
>
K
>
KDC SYSTEMS (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2024 4:42:57 PM
Creation date
2/14/2022 2:31:21 PM
Metadata
Fields
Template:
Contracts
Company Name
KDC SYSTEMS
Contract #
A-2022-009-01
Agency
Public Works
Council Approval Date
1/18/2022
Expiration Date
1/17/2025
Insurance Exp Date
10/1/2025
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Basic Programming of PLCs, Festo <br />• Intermediate Programming of PLCs, Festo <br />• PLC Redundancy, Aryan Elmosanaat Training Center <br />• Introduction to Industrial Profibus, Klan Control Engineering Co. Ltd. <br />• Modbus, Aryan Elmosanaat Training Center <br />• Introduction to Simatic WINCC (Siemens SCADA), Kian Control Engineering Co. Ltd. <br />• Variable Frequency Drives, E and M <br />• Introduction to EPLAN Electric, Kian Control Engineering Co. Ltd. <br />• General Principles of Metrology & Calibration, Khat Ramz Co.Ltd. <br />Recent Projects: <br />• Gilead Clinical Flex Fill Line and Second Formulation Suite <br />Instrument and panel design. <br />In -Current <br />PLC, HMI and SCADA programming. <br />• Orange County Water District Ground Water Replenishment System <br />Instrument and panel design. <br />In -Current <br />PLC, HMI and SCADA programming. <br />• City of Santa Ana Well 16 and 33 SA-5. <br />PLC and HMI programming. <br />2019 <br />• Irvine Ranch Water District Michelson Water Recycling Plant Biosolids and Energy Recovery <br />Facilities <br />SCADA programming. <br />2019 <br />• Edwards Air Force Base ACU and Aircraft Support Equipment Upgrades. <br />PLC, HMI and SCADA programming, Commissioning, Startup. <br />2018 <br />• Automation Plating Corporation Plating Line PLC Upgrade. <br />PLC and HMI programming, Commissioning, Startup. <br />2018 <br />• Water Replenishment District of Southern California Goldsworthy Desalter Expansion <br />Commissioning, Loop check, FAT and PLC program modification. <br />2017 <br />• Global Harvest Foods Mixing System. <br />Panel Design, PLC and SCADA programming, Commissioning, Startup. <br />2017 <br />• City of San Clemente Marblehead Coastal Urban Runoff System. <br />PLC and HMI programming, Loop check and commissioning. <br />2017 <br />• MWD Henry J. Mills WTP Industrial Wastewater Handling Improvement. <br />Commissioning Plan, Instrument and control system training. <br />2017 <br />• Western Riverside County Regional Wastewater Authority 14MGD Plant Expansion. <br />Commissioning Plan for whole Plant. <br />2016 <br />• Irvine Ranch Water District Baker Water Treatment Plant <br />Control Panel FDT, Instrument Setup and calibration, Loop checks. <br />2016 <br />• MWD Weymouth Water Treatment Plant. Oxidation and Ozonation Facilities. <br />Instrument setup and calibration. Loop checks, Instrument training. <br />2015 - 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.