My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Santa Ana General Plan Binder
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
02/15/2022 Regular
>
Santa Ana General Plan Binder
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2022 9:58:29 AM
Creation date
2/16/2022 9:46:02 AM
Metadata
Fields
Template:
City Clerk
Date
2/15/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WEST SANTA ANA BOULEVARD <br />Envisioned Character <br />PURPOSE AND INTENT The Images above are illustrative, Intended <br />to describe the envisioned character for the <br />The West Santa Ana Boulevard Focus Area focusarea: <br />connects the Harbor Mixed Use Transit 1. The existing industrial portion of <br />the focus area will be designated <br />Corridor and Downtown Santa Ana, with <br />p <br />for Industrial/Flex to promote new <br />the OC Streetcar Project improvements opportunities, Including dining <br />creating the physical transit link in 2022. operations <br />2. The Industrial/Flex designation in the <br />The intent is to transition a group of auto- existing industrial portion of the focus <br />�— oriented neighborhoods, businesses, and area will allow for creative maker <br />institutions into a series of transit -oriented spaces. <br />3. Future streetcar service will give <br />neighborhoods that support and benefit residents and visitors a way to travel to <br />from future streetcar stops. key places in the city without a car. <br />U <br />is r� .�..•• CITY OF SANTA ANA GENERAL PLAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.