Laserfiche WebLink
■ ��� <br />I. C C Y RFP For On -Call Electrical Repair & Rehabilitation Services <br />ELECTRIC LEED Electric, Inc. Statement of Qualification <br />Daniel Flores, IBEW Certified Electrician: General Foreman Electrician: <br />Mr. Flores has been with Leed Electric, Inc. since 2004, and has completed the IBEW apprenticeship program <br />and worked for Leed Electric as an Apprentice and graduated to Journeyman and was promoted to Foreman <br />then General Foreman. Mr. Flores is OSHA 10 and 30 certified and completed Confined Space Training, and <br />graduated with an Associate Degree in Liberal Arts from Santa Monica College. He has worked on and <br />completed several projects for Leed Electric which some are listed here: <br />• LACDPW Compton Creek, Foreman demo of existing conduits, wires and controls at lift station facility <br />to run new conduit and wire for new engines and pumps installed at the facility by the general <br />contractor. Installed gas detector system and propane gas backup for engine operations, conducted field <br />testing and started up system. Installed field site lighting and inside pump station, conducted field <br />meetings and coordinated work with project manager and general contractor, the project concluded in <br />2015. Position: Foreman <br />• LACDPW Terminal Island WRP Tertiary Filters Rehabilitation, Foreman Installed conduit systems and <br />wiring to new MOV's at the sand filter area, installed new control panel for new MOV's and pulled <br />analog, control and power wire to (64) new MOV's, the project was completed in 2015. Position: <br />Foreman <br />• West Basin Municipal Water District Edward C. Little Water Recycling Facility Clean -in -Place Waste <br />Discharge Project, Foreman Worked on field layout and material procurement and installation. Made <br />field installation schedule for project, conducted safety meetings, started the project from underground <br />conduit installation and up, installed utility conduit run, installed new Switchgear, MCC and lighting. <br />Ran conduit and wire in the pump station and treatment system, tested system and startup conducted. <br />Managed installation and coordination with owner and general contractor to complete the project in late <br />2018. Position: Foreman <br />• City of Los Angeles, Venice Dual Force Main and Generator Installation, General Foreman, he has <br />overseen the installation from underground PVC conduits to above ground GRC and PVC Coated <br />conduits. He has assisted in the redesign and installation of (2) large Cummins generators. Installation of <br />new control panels, Switchgear, Instrumentation and Controls, The project completed in late summer <br />2019. <br />With the training and experience working for Leed Electric for so many years Mr. Flores is qualified for any <br />wastewater project that LEI is awarded and in currently supervising several LEI projects in his General <br />Foreman capacity where he will oversee a Foreman and his crew to ensure the project is completed on time and <br />per spec. <br />P a g e 1 16 13138 Arctic Circle, Santa Fe Springs, CA 90670-5508 LEED Electric Inc. <br />