My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LEED ELECTRIC, INC.
Clerk
>
Contracts / Agreements
>
L
>
LEED ELECTRIC, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:50:21 AM
Creation date
3/3/2022 2:38:18 PM
Metadata
Fields
Template:
Contracts
Company Name
LEED ELECTRIC, INC.
Contract #
A-2022-025-02
Agency
Public Works
Council Approval Date
2/15/2022
Expiration Date
2/14/2025
Insurance Exp Date
10/1/2024
Destruction Year
2030
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
27 ■ ��� <br />`MMU <br />ELECTRIC <br />RFP For On -Call Electrical Repair & Rehabilitation Services <br />LEED Electric, Inc. Statement of Qualification <br />Joseph Evanilla, IBEW Certified Electrician: General Foreman Electrician: <br />Mr. Evanilla came to Leed Electric in early 2020 as a General Foreman Electrician, with more than 35 years of <br />experience planning, developing, and implementing construction projects. Extensive understanding in Public <br />Works Water Production. Mr. Evanilla has spent his careering working for A & B Electric Company, then over <br />to Morrow -Meadows Corp before joining Leed Electric. His career and training highlights are EPRI <br />Certification, AC/DC power and control systems, Electro-mechanical proficiency, Complex issues <br />management, Understanding of client business requirements, Strong customer focus, Works well in team <br />environment, Blueprint takeoff, Project layout, Control schematic production and an Extensive knowledge in <br />electrical tools and equipment. Some of the many projects Mr. Evanilla has completed are listed here: <br />LAXFUEL Corporation, 4 TANK Project 2019, Metropolitan Water District, Joseph Jensen WTP Plant <br />Electrical Upgrades Stage IA 2018, City of Chino, Eastside Water Treatment Plant 2016, Three Valleys <br />Municipal Water District, San Antonio Spreading Grounds 2014, City of Brea, La Florista Sewer Lift Station <br />2014, City of Covina, Charter Oak Reservoir 2014, Fontana Water Co., Sandhill Hydroelectric Generators <br />Plasent 2013 and Rancho Cucamonga Water District, Arthur Bridge WTP 2013 and many more dating back to <br />2003. Mr. Evanilla is a valued addition to the Leed Electric team with his unmatched experience, skills and <br />leadership qualities. <br />Michael Marshall, IBEW Certified Electrician: Foreman Electrician: <br />Mr. Marshall joined Leed Electric in 2016; he completed the IBEW Five Year Apprenticeship Program in 2016. <br />Mr. Marshall has previous experience working for Neal Electric working on water and waste water projects. <br />When Mr. Marshall joined Leed Electric in 2016 he began working on several water and wastewater treatment <br />projects in varies stages of completion. Some of the projects Mr. Marshall has completed are the following: <br />• Los Angeles Wastewater Integrated Network Systems (LAWINS), working with the integration at <br />Hyperion Treatment Plant under the supervision of our General Foreman Instrument Tech. <br />• 2017 West Coast Basin Barrier Telemetry Project, for Los Angeles County Department of Public <br />Works, upgraded the existing telemetry system by adding new PLC's with battery backup, re -terminated <br />the system to work with the new interface. For the West Coast Barrier reach of the Seawater Barrier <br />System for LACDPW. Position: Journeyman <br />• Currently working on the Seawater Barrier Maintenance Contract as the dedicated Certified Electrician, <br />when WO's come in he reviews the requirements and completes the necessary work for the Los Angeles <br />County Department of Public Works. Installing new sensors, troubleshooting, working with our subs <br />troubleshooting communication issues and solving these problems so that County may have a working <br />monitoring system. <br />Mr. Marshall has also worked on projects such as the West Basin Project Phase V, LAX/Crewshaw Transit <br />Corridor and has some experience in Photovoltaic Systems in his training. While at Leed Electric he has worked <br />under the direction of Miguel Chavez working on the Telemetry Projects recently completed by Leed Electric <br />and has valuable expertise at the Barrier Systems. <br />P a g e 118 13138 Arctic Circle, Santa Fe Springs, CA 90670-5508 LEED Electric Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.