Laserfiche WebLink
27 ■ ��� <br />`CCLI <br />ELECTRIC <br />RFP For On -Call Electrical Repair & Rehabilitation Services <br />LEED Electric, Inc. Statement of Qualification <br />Project No. 3 <br />Project Name <br />Burris Pump Station Phase 2 <br />Location <br />Anaheim, CA <br />Owner <br />Orange County Water District <br />Project Manager Name <br />Ryan Bouley <br />E-mail and Telephone No. <br />(714) 378-3200 <br />rbouley@ocwd.com <br />Contract Value <br />$ 2,501,583.50 <br />(including change orders) <br />Electrical and Instrumentation for a new pump station. 4160V, 2000A New <br />Brief Description of Firm's Scope of <br />Service, CITY (4) 1750HP 4160 VFD's 2000A Motor Control Center <br />Work for the Project <br />Installation, Allen-Bradley PLC, HMI and SCADA Installation and installation <br />of a 12KV/4.2KV Transformer. <br />Completion Date <br />November 2017 <br />Project No. 4 <br />Project Name <br />Regional Treatment Plant Cogeneration & Switchgear Upgrade Project <br />Location <br />Laguna Niguel, CA <br />Owner <br />South Orange County Wastewater Authority <br />Project Manager Name <br />Mike Matson & Brian Peck <br />E-mail and Telephone No. <br />(949) 234-5400 <br />mmatson@socwa.com & bpeck@socwa.com <br />Contract Value <br />$ 1,811,025.28 <br />(including change orders) <br />Brief Description of Firm's Scope of <br />Demolition of existing conduit and wire, furnish and install underground <br />Work for the Project <br />conduit, manholes, 2,000FT of 12x750MCM XHHW Power Feeder Wire, <br />Instrument Cable, Switchgear, Cogeneration Engine, PCL and SCADA <br />Completion Date <br />July 2018 <br />Project No. 5 <br />Project Name <br />Dominguez Gap Barrier Telemetry Systems <br />Location <br />Los Angeles County <br />Owner <br />County of Los Angeles Department of Public Works <br />Project Manager Name <br />Adam Lee, P.E. <br />E-mail and Telephone No. <br />(626)458-6185 <br />awlee@dpw.lacounty.gov <br />Contract Value <br />$ 2.1M <br />(including change orders) <br />Brief Description of Firm's Scope of <br />Furnish & Install 9 Miles of Fiber Optics, Power and Instrumentation Cable <br />Work for the Project <br />for SCADA and Telemetry System and Flow Diversion. <br />Completion Date <br />June 2018 <br />P a g e 122 13138 Arctic Circle, Santa Fe Springs, CA 90670-5508 LEED Electric Inc. <br />