Laserfiche WebLink
MASTER IRRIGATION LEGEND <br />GENERAL IRRIGATION NOTES: <br />1. ALL LOCAL, MUNICIPAL AND STATE LAWS ARE HEREBY INCORPORATED INTO THESE PLANS <br />AND SHALL BE CARRIED OUT BY THE CONTRACTOR. <br />3, THE CONTRACTOR IS EXPECTED TO SECURE COPIES OF THE CURRENT ARCHITECTURAL AND <br />ENGINEERING PLANS AND ANIMAMZE THEMSELVES WITH ALL ASPECTS OF THE PROJECT AS <br />IT RELATES TO THEIR SCOPE. <br />4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO SECURE ANY AND ALL PERMITS REQUIRED TO <br />PERFORM THEIR SCOPE OF WORK. <br />5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATIONS OF ALL EXISTING <br />UTLITES WITHIN THE LIMIT OF WORK PRIOR TO COMMENCING ANY WORK. LOCATIONS <br />SHOWN ON THE PLANS ARE APPROXIMATE AND THE LANDSCAPE ARCHITECT MAKES NO <br />GUARANTEES ABOUT THEIR ACTUAL LOCATIONS. NOTIFY THE CITYS AUTHORIZED <br />REPRESENTATIVE IN THE EVENT DISCREPANCIES ARE FOUND BETWEEN THE PLANS AND <br />CONDITIONS IN THE HELD. <br />6. THE IRRIGATION DESIGN SHOWN HERE -IN IS DIAGRAMMATIC AND SHOWN FOR GRAPHIC <br />CLARITY ONLY. ALL MAINLINE, SLEEVING, VALVES, ETC. SHALL BE INSTALLED WITHIN THE <br />LIMIT OF WORK AND LOCATED IN LANDSCAPE AREAS WHERE EVER POSSIBLE. <br />CONTRACTOR WILL BE EXPECTED TO MAKE ADJUSTMENTS IN THE FIELD TO AVOID <br />CONFLICTS WITH PROPOSED PLANING AND ARCHITECTURAL IMPROVEMENTS, <br />7. THE CONTRACTOR IS EXPECTED TO SUBMIT ANY QUESTIONS REGARDING THE PROPOSED <br />IRRIGATION DESIGN WHEN IT IS CLEAR THAT FlELD CONDITIONS DO NOT MATCH WHAT IS <br />DEPICTED ON THE PLANS. SUBMIT QUESTIONS TO THE GENERAL CONTRACTOR AS <br />OFFICIAL RFI'S (REMUEST5PoRTNPDRMATWIn. IN CASES WHERE THE CONTRACTOR <br />WILLFULLY INSTALLS EQUIPMENT WITHOUT CLARIFYING INTENT OF THE DRAWINGS, THE <br />WORK WILL BE SUBJECT TO CHANGE AT CONTRACTOR'S EXPENSE. <br />B. THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AS SHOWN IN THE DETAILS AND <br />SPECIFIC TONS. PROPOSED CHANGES BY THE CONTRACTOR SHALL BE SUBMITTED IN <br />WRITING FOR RENEW AND APPROVAL. <br />9. FINAL LOCATIONS FOR THE POINT -OF -CONNECTION AND THE AUTOMATIC CONTROLLER <br />SHALL BE DETERMINED IN THE HELD. STAKE LOCATIONS OF SAID EOUIPMENT FOR REVIEW <br />AND APPROVAL BY THE CITY AND THE ARCHITECT PRIOR TO COMMENCING ANY WORK. <br />10, UNLESS NOTED OTHERWISE, CONTRACTOR SHALL PROVIDE THREE ADDITIONAL PILOT WEER <br />AND ONE COMMON WEE TO END OF ANY MAINLINE RUN FOR POSSIBLE FUTURE <br />EXPANSION. PROVIDE AND INSTALL AS A 1OFT COIL INSIDE A RECTANGULAR VALVE BOX.. <br />11. CONTRACTOR SHALL INSTALL ALL PIPE UNDER PAVED AREAS (HARDSCAPE, PARKING LOTS, <br />ETC.) INSIDE SLEEVING AS SHOWN ON THE LEGEND AND SPECIFICATIONS. INSTALL PER <br />DETAILS PROVIDED. AT A MINIMUM, SLEEVES ARE TO BE 2X THE DIAMETER OF THE PIPE <br />OR WIRE BUNDLE CARRIED, SLEEVES SHALL EXTEND 6" MIN. PAST THE EDGE OF PAVED <br />AREAS ABOVE. <br />12, IRRIGATION HEADS SHALL BE INSTALLED WITH THE NOZZLE, SCREEN, AND ARCS SHOWN <br />ON THE LEGEND. CONTRACTOR IS EXPECTED TO PERFORM MINOR ADJUSTMENTS IN THE <br />FIELD TO LIMIT THE AMOUNT OF OVER -SPRAY ONTO ANY HARDSCAPE ELEMENT. WHERE <br />OCCURS, AND AT NO ADDITIONAL COST TO THE CITY, CONTRACTOR IS HEREBY DIRECTED <br />TO REPLACE NOZZLES, SCREENS, ETC. 'NTH MORE APPROPRIATE RADIUS EQUIPMENT TO <br />BETTER FIT ACTUAL FIELD CONDITIONS ENCOUNTERED. CONTRACTOR SHALL PROVIDE <br />HEAD -TO -HEAD COVERAGE THROUGHOUT. <br />13, ALL IRRIGATION ROTOR AND ROTATORS WITHIN TURF AREAS SHALL BE (6°) POP -UPS. <br />14 THE CONTRACTOR IS EXPECTED TO ADJUST THE PRESSURE REGULATOR ON EACH RCV SO <br />THAT THE HEAD FARTHEST AND HIGHEST IN ELEVATION OPERATES WITHIN THE OPERATING <br />PRESSURE SHOWN ON THE IRRIGATION LEGEND. <br />15, THE PROPOSED IRRIGATION DESIGN IS BASED ON A STATED STATIC WATER PRESSURE OF <br />88 PSI PER THE CITYS WATER DEPARTMENT. IT IS THE CONTRACTOR'S RESPONSIBILITY <br />TO VERIFY THE STATIC WATER PRESSURE AVAILABLE PRIOR TO COMMENCING ANY WORK. <br />NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES. <br />16, WHERE IRRIGATION PIPE INDICATED ON THE PLANS IS NOT SIZED, THE CONTRACTOR SHALL <br />INSTALL SAID PIPE AT AN APPROPRIATE SIZE NOT TO EXCEED SHIPS IN PVC PIPE AND <br />7PS IN COPPER PIPE. ANY SUCH CHANGES SUCH AS THESE SHALL BE MADE AT NO <br />COST TO THE CITY. <br />17. THE CONTRACTOR WILL BE EXPECTED TO COORDINATE THE ELECTRICAL SERVICE AND <br />STUB -OUT LOCATION WITH THE GENERAL CONTRACTOR AND MAKE THE FINAL CONNECTION <br />TO THE AUTOMATIC CONTROLLER AS SHOWN ON THE PLANS. <br />18, PRESSURE REGULATING DEVICES ARE REQUIRED IF WATER PRESSURE IS BELOW OR <br />EXCEEDS THE RECOMMENDED PRESSURE OF THE SHOVED IRRIGATION DEVICES. <br />19. CHECK VALVES OR ANT -DRAIN VALVES ARE REQUIRED ON ALL SPRINKLER HEADS WHERE <br />LOW POINT DRAINAGE COULD OCCUR. <br />IRRIGATION SCHEDULE NOTES <br />A. THE IRRIGATION SCHEDULES FOR PLANT ESTABLISHMENT AND ESTABLISHED <br />LANDSCAPE SHALL BE DETERMINED BY THE MAINTENANCE CONTRACTOR AND <br />SHALL BE CHANGED ACCORDING TO THE MONTH OF THE YEAR. THEY ARE TO <br />BE USED IN CONJUNCTION WITH THE IRRIGATION SYSTEM'S SMART <br />CONTROLLER TO ADJUST RUNTIMES BASED ON ACTUAL ETD DATA. <br />CONTRACTOR IS EXPECTED TO MAKE ADJUSTMENTS AS NEEDED TO ACCOUNT <br />FOR PLANT TYPES AND ON -SITE MICRO -CLIMATES. <br />B. IRRIGATION RUN-TIMES SHALL BE ADJUSTED OR RUN AS REPEAT CYCLES TO <br />ELIMINATE ANY WATER RUN-OFF OR EDUCING OF IRRIGATION WATER IN <br />LANDSCAPE AREAS <br />REVISIONS <br />SYMBOL <br />MANUFACTURERAMODEL/DESCRIPTION <br />90Z <br />Hunter MP1000 PROS-06-PRS40-CV <br />Turf Rotator, 6° pop-up with check wlw, <br />pressure requlated to 40 psi, MP Rotator nozzle <br />on PRS40 body. M=Maroon adi arc 90 to 210, <br />L=Light Blue 210 to 270 arc, O=Olive 360 arc. <br />SSS <br />Hunter MP2000 PROS-O6-PR540-11 <br />Tur! Rotator, 6" pop-up with factory installed <br />check wlw, pressure regulated to 40 psi, MP <br />Rololor nozzle on PRS40 body. K=Block adj <br />arc 90-210, G=Green adj arc 210-270, R=Red <br />360 arc. <br />Hunter MP3000 PROS-06-PR540-CV <br />Turf Rotator, 6" pop-up with factory Installed <br />check wlw, pressure regulated to 40 psi, MP <br />Rololor nozzle on PRS40 body, B=Blue adj arc <br />90-210, Y=Yellow adj arc 210-270, A=Cray 360 <br />blo <br />Hunter MP3500 PROS-06-PRS40-CV <br />Turf Rotator, 6" Pop-up with factory installed <br />check wlw, pressure regulated to 40 psi, MP <br />Rololor nozzle on PRS40 body, LB -light brown <br />ad u.bable arc, 90-210, <br />Air <br />Hunter MPBOOSR PROS-06-PRS40-CV <br />Turf Rotator, 6" pop-up with check calve, <br />pressure regulated to 40 psi, MP Rotator nozzle <br />on PRS40 body. ADJ=Orange and Gray ( orc <br />90-210), 360=Lime Green and Groy (orc 360) <br />© ®® <br />Hunter MP815 PROS-06-PRS40-CV <br />Turf Rotator, 6° pop-up with check ulw, <br />pressure requlated to 40 pi, MP Rotator nozzle <br />on PR540 body. M=Maroon and Gray adj orc 90 <br />to 210. L=Light Blue and Gray 210 to 270 orc, <br />O-Oliw and Groy 360 orc. <br />SYMBOL MANUFACTIRERAMODEL <br />® Hunter 1-25-O6-SS-HS <br />® Hunter 1-25-O6-SS-HS <br />Hunter 1-40-06-SS-HS <br />PRESSURE CALCULATION <br />P.O.C. NUMBER: 01 <br />Water Source Information: <br />FLOW AVAILABLE <br />Water Meter Size: <br />3' <br />Flow Aailable: <br />225,00 gpm <br />PRESSURE AVAILABLE <br />Static Pressure of POC: <br />88.00 PSI <br />Elewtion Change: <br />2,00 N <br />Service Line Size: <br />Lenolh of Service Ene <br />3" <br />SO ft <br />Pressure Available: <br />87.00 psi <br />DESIGN ANALYSIS <br />Maximum Station Flow: <br />Flow Avo'lobI. at PZ <br />98.80 gpm <br />) 00 <br />Residual Flow Available: <br />126.20 gpm <br />Critical Stofion: <br />27 <br />Design Pressure: <br />40.00 psi <br />Friction Loss: <br />2.60 psi <br />Fittings Loss: <br />Elevation Loss: <br />0,26 psi <br />0.00 psi <br />Loss through Valve: <br />22.50 psi <br />Pressure Req. at Critical Station: <br />Loss for Fittings: <br />65.36 psi <br />0.00 psi <br />Loss for Main Line: <br />0.03 psi <br />Loss for POD to Valve Elewtion: <br />Loss far Backflow: <br />NO psi <br />VOO psi <br />Loss for Molter Valve: <br />Loss for Water Meter: <br />2,38 psi <br />1.00 psi <br />Critical Station Pressure at POD: <br />Pressure Available <br />79.77 psi <br />.'OR <br />Residual Pressure Available: <br />7.23 psi <br />QTY PSI <br />18 40 <br />79 40 <br />135 40 <br />12 40 <br />21 40 <br />7 40 <br />QTY PSI C,PM RADIUS <br />71 40 3.80 37' <br />3 40 6.10 40' <br />102 40 7.60 41' <br />`hWTscAw Sri �ITFRY� <br />Wo - r 9y MIOIAFL IFLHTIER <br />� U iZM� FCR <br />w"�f'D". r�saF cram ' <br />SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY <br />RAIN BIRD 300-BPE-PRS-D ANGLE 31 <br />3" BRASS ELECTRIC REMOTE CONTROL VALVE, IN ANGLE <br />CONFIGURATION. PATH PRS-DIAL PRESSURE REGULATING <br />MODULE. <br />RAIN BIRD 33-DLRC 16 <br />0 3/4" BRASS QUICK -COUPLING VALVE, WITH <br />CORROSION -RESISTANT STAINLESS STEEL SPRING, LOCKING <br />THERMOPLASTIC RUBBER COVER, DOUBLE TRACK KEY <br />LUG, AND 2-PIECE BODY. <br />GRISWOLD ISOLATOR UNION 4 <br />w BRASS DWS VALVE WITH UNION BALL VALVE, INCLUDES <br />PLUG IN BOSS. SIZES 1/2" THROUGH 3", SAME SIZE <br />AS IRRIGATION LINE. 100 MESH STAINLESS STEEL STRAINER <br />AND PACKING GLAND BALL VALVE ARE IDEAL FOR DIRTY <br />WATER APPLICATIONS. <br />GRISWOLD 216ON 3" 1 <br />k 3" SOLENOID, NORMALLY OPEN MASTER VALVE. CAST <br />IRON AND BRONZE MATERIAL. NPT END CONNECTION. <br />BF ZURN 375-BP 3° 1 <br />RE LOSS PRESSURE BACKFLOW r PREVENTER. IZES 2 <br />1/2% 3% 4', 6', 8% 10" <br />CALSENSE ET2000-32 <br />© 32 STATION AUTOMATIC CONTROLLER WTH RADIO <br />COMMUNICATIONS PER CITY REQUIREMENTS. <br />® Rain Bird FS-350-B 1 <br />3" and Higher Flow Sensor for use with Rain Bird <br />Mpxicom, SiteControl, and ESP-LXD Central <br />Control Systems. Brass Model. Suggested <br />Operatinq Range of 12.0 GPM to 45,000 GPM. <br />Strong Box SBBC-75SS OR APPROVED EQUAL 1 <br />High profile, tube and wire construction smooth <br />touch wrface, stainless steel bockflow enclosure. <br />76.5% 39"H, 25.5"W (194.31 cm L, 99.06cm H, <br />64.77om W), <br />Irrigation Lateral Line: PVC Schedule 40 UP TO 2° <br />Class 200 SDR 21 OVER 2" 13.027 I.f. <br />WTH SON. 80 FITTINGS, TYPICAL. <br />Irrigation Mainline: PVC Class 315 SDR 13.5 3,024 I.f. <br />WTH LEEMCO RESTRAINT FITTINGS, TYPICAL. <br />Pipe Sleeve: PVC Schedule 40 2X Uk OF PIPE 209.1 I.f. <br />Vd. Cnllaut <br />Vdw Number <br />Vdw Flow <br />" Vdw Sze <br />L-1..31AIJE <br />UndergroundSelviceAle <br />msoalhem Ca c' <br />TWO WORKING DAYS <br />49 BEFORE YOU DIG <br />v below. <br />smCSll6dhey ie. wwtl.-wq <br />NOTICE TO CONTRACTOR <br />PURA/ANT TU ASSEMBLYWLL 4YIV WO F AVANW PERMIT <br />IS VAUO UNES'S THE CONM RN CONTACTS AND, OBTAINS <br />A MO AILRT M KO' NUMBIR CALL fit AT (FAST TIRO <br />XGPlfpIC 0./1T PPoQP TO CCWMNCMC fXC1VADM.. <br />IRRIGATION ��yy��gqqq����rr ALCULA710NS <br />CABRILLO PAItK'1M�I�KN RENOVATION <br />CABRILLO PARK - CORNER OF CABRILLO PARK DR. & FRUIT ST. <br />CITY OF SANTA ANA SHEET 6 OF <br />