Laserfiche WebLink
PROJECT TITLE: <br />Cabrillo Irrigation Renovation <br />PROJECT CATEGORY: <br />Park Facility Improvements <br />Park Facility <br />LOCATION MAP <br />N <br />J = <br />. s <br />Park � <br />� FF <br />2 <br />BROW <br />ST J w r <br />CiR x <br />N <br />6TH ST <br />PARKCDl1RT PL Uzi CU?C1. L <br />W <br />Lu <br />Y <br />] 4TH T <br />CITY OF SANTA ANA FY 21/22 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION <br />Design and installation of a new State of the Art <br />Automatic irrigation system throughout the <br />Cabrillo Park site. <br />EXHIBIT 6 <br />PROJECT NEED: <br />The existing irrigation system is an old hydraulic <br />system with a transit main line pipe. The system <br />continually breaks down and is unreliable. <br />Through the years, many of the irrigation heads <br />have been replaced with the wrong nozzles that <br />have compromised the efficiency of the watering <br />in he park and creates many dry brown spots. <br />PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />Construction 319 143 <br />TOTAL $ 319,143 <br />SOURCE OF FUNDS FV 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />A&D District 2 319 143 _ <br />TOTAL $ 319,143 <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Agency Jason Gabriel, Principal Civil Engineer 5 Apr-2022 <br />&nbsp; <br />City Council <br />&nbsp;15 &ndash;&nbsp;47 <br />4/5/2022 <br />&nbsp; <br />