Laserfiche WebLink
Industrial Streets (Phase 1) Water & Sewer Improvements <br />April 5, 2022 <br />Page 3 <br />The City notified a total of 623 regional vendors via PlanetBids, 20 of which are Santa <br />Ana based. Fifty-five vendors requested bidding documents. A total of five bids were <br />received. However, no bids were received from Santa Ana contractors. <br />Bid Results Summary <br />RANK <br />BIDDER'S NAME <br />LOCATION <br />BASE BID <br />1 <br />SRK Engineering, Inc. <br />Escondido <br />$3,024,538.00 <br />2 <br />Big Ben, Inc. <br />Irvine <br />$3,688,260.00 <br />3 <br />CEM Construction Corp. <br />Montebello <br />$3,800,587.50 <br />4 <br />Colich & Sons L.P. <br />Gardena <br />$4,246,237.00 <br />Of the five bids received, four were deemed responsive. SRK Engineering, Inc. submitted <br />the lowest responsive base bid, in the amount of $3,024,538.00 (Exhibit 2). As specified <br />in the bid documents, the lowest bid shall be determined on the basis of the Base Bid. <br />Based on the bid analysis and a contractor's reference check, staff recommends <br />awarding the construction contract to SRK Engineering, Inc., in the amount of the base <br />bid totaling $3,024,538.00 (Exhibit 3). SRK Engineering, Inc. has not performed previous <br />work in the City of Santa Ana as a prime contractor; however, they are currently a <br />subcontractor on the Main Street Water and Sewer Improvements (Project Nos. 21-6451 <br />& 21-6461). Under this construction contract, SRK Engineering, Inc. will be performing <br />work as a prime contractor. <br />Project Delivery <br />To deliver a complete project, in addition to the construction contract, the estimated total <br />project delivery cost includes construction administration, inspection, and testing, along <br />with an allowance for contingencies to account for unexpected or unforeseen conditions. <br />Construction administration and inspection includes the following: construction <br />management; implementation of the City's Community Workforce Agreement <br />requirements; inspection of the Contractor's work to ensure contract compliance, <br />workmanship, and quality; and materials testing. As indicated in the Cost Analysis <br />(Exhibit 4) and as summarized in the table below, the estimated total construction delivery <br />cost of the project is $4,050,000.00. <br />Project Item <br />Total <br />Construction Contract <br />$3,024,538.00 <br />Construction Administration, Inspection, Testing <br />$453,681.00 <br />Contingencies <br />$421,781.00 <br />Water Engineering <br />$150,000.00 <br />TOTAL CONSTRUCTION DELIVERY COST <br />$4,050,000.00 <br />City Council 16 — 3 4/5/2022 <br />