My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-04-05
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
04/05/2022 Special and Regular & HA
>
Agenda Packet_2022-04-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2022 4:27:45 PM
Creation date
4/4/2022 9:25:00 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
4/5/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
684
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 21-6452 & 21-6456 <br />INDUSTRIAL STREETS (PHASE 1) WATER AND SEWER IMPROVEMENTS <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: SRK Engineering <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Mobilization (max. 5% of total bid) <br />1 <br />LS <br />$ 140,000 <br />$ 140,000 <br />2 <br />12" Class 305 (DR 14) C900 PVC <br />2400 <br />LF <br />$ 250 <br />$ 600,000 <br />Pipe <br />3 <br />1" Copper Water Service <br />34 <br />EA <br />$ 5,600 <br />$ 190,400 <br />4 <br />2" Copper Water Service <br />4 <br />EA <br />$ 9,000 <br />$ 36,000 <br />5 <br />4" Fire Service <br />2 <br />EA <br />$ 7,500 <br />$ 15,000 <br />6 <br />6" Fire Service <br />3 <br />EA <br />$ 10,500 <br />$ <br />31,500 <br />7 <br />8" Fire Service <br />1 <br />EA <br />$ 14,000 <br />S 14,000 <br />8 <br />12" Resilient Wedge Gate Valve <br />4 <br />EA <br />$ 4,400 <br />$ 17,600 <br />9 <br />16" Butterfly Valve <br />1 <br />EA <br />$ 17,500 <br />$ 17,500 <br />10 <br />16" Line Stop <br />2 <br />EA <br />$ <br />$ <br />33,000 <br />66,000 <br />11 <br />16" x 12" Hot Tap <br />2 <br />EA <br />$ 22,500 <br />$ 45,000 <br />12 <br />Fire Hydrant <br />l <br />EA <br />$ 17,200 <br />$ 17,2000 <br />13 <br />Fire Hydrant with Protective Curb <br />6 <br />EA <br />$ 18,000 <br />$ 108,000 <br />and Posts <br />14 <br />Sewer Lateral and Cleanout (Open <br />29 <br />EA <br />$ 8,250 <br />$ 239,250 <br />Trench) <br />uty uouncll l b — I 4/b/2U21 <br />P-1 of P-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.