My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-04-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
04/19/2022 Regular
>
Agenda Packet_2022-04-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2022 11:39:43 AM
Creation date
4/18/2022 10:54:36 AM
Metadata
Fields
Template:
City Clerk
Date
4/19/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
969
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Local Street Sidewalk Improvements <br />PROJECT CATEGORY: <br />Street Improvements <br />Street/Bridge Improvements & <br />Widening <br />LOCATION MAP A <br />N <br />CITY OF SANTA ANA FY21/22CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Project involves replacement of existing damaged concrete <br />sidewalks in residential neighborhoods and will include the removal <br />and replacement of adjacent damaged concrete curbs, gutter and <br />driveways. Project will focus on areas with the highest concentration <br />of needed repairs, to help mitigate trip and fall hazards and reducing <br />potential of liability claims and assist in complying with regulations <br />set forth by the American with Disabilities Act. <br />PROJECT NEED: <br />Staff evaluates the condition of damaged sidewalks, curbs, gutters and <br />driveways to identify uneven surfaces and cracks that may pose a risk <br />to pedestrians. The goal is to improve safe walking accessibility for <br />pedestrians and increase active modes of transportation, such as <br />walking and biking. <br />PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />Construction 373,064 - - - - - - <br />TOTAL 373,064 - <br />SOURCE OF FUNDS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />CDBG Programs 373,064 - - - - - - <br />TOTAL 373,064 - - - - <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works C/P Engineering Gilbert Castillo, Senior Engineer 22-Mar-2022 <br />City Council 18 — 14 4/19/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.