My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-04-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
04/19/2022 Regular
>
Agenda Packet_2022-04-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2022 11:39:43 AM
Creation date
4/18/2022 10:54:36 AM
Metadata
Fields
Template:
City Clerk
Date
4/19/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
969
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C - PROPOSAL <br />We will update the estimate of probable construction cost as needed to reflect the <br />Backcheck/Bid Set documents. <br />We will assist the City and Library with FIFE bid/procurement packages. <br />Task 4 Meetings and Deliverables <br />• Plan Check package <br />• Backcheck/Bid Set, including drawings, specifications (CSI format), and structural <br />calculations <br />• Historic Compatibility Analysis <br />• Assist with Historic Exterior Modification Application <br />• 90% and final estimates of probable construction cost <br />• Up to five (5) PMT meetings <br />• One (1) Technical Meeting (Planning and Building) <br />• One (1) Historic Resources Commission presentation <br />• Optional presentation to City Council <br />TASK 5: BIDDING, CONSTRUCTION ADMINISTRATION, AND CLOSEOUT <br />We will assist the City in advertising the project, responding to contractors' questions, <br />preparing project addenda, evaluating bids, notifying the successful bidder, and <br />collecting and reviewing bonds, insurance certificates, and construction schedules. <br />We will prepare for and conduct the preconstruction conference; help the Library <br />monitor and document the project's progress for quality, cost, and liability control; <br />and inform the City and the Library about project progress. We will respond to RFIs, <br />review product submittals and shop drawings, analyze and assist in negotiation of <br />change orders as needed, review pay requests, review the punch list, prepare final <br />inspection reports, and attend regular construction meetings. <br />Group 4 will complete applicable certificates, review the contractor's record drawings, <br />and collect and coordinate written warranties and maintenance manuals required of <br />the contractor. <br />Task 5 Meetings and Deliverables <br />• Prebid meeting <br />• Preconstruction meeting <br />• Project addenda as needed <br />• Project conformed set <br />• Monthly construction site visits <br />• Responses to RFIs and Substitution Requests; ASIs, RFIs, submittals, etc. <br />• Compile record documents <br />• Optional City Council meeting — Award of Contract <br />U- <br />O <br />W <br />a <br />O <br />Ln <br />N <br />m <br />a <br />f- <br />w <br />af <br />U <br />w <br />H <br />U <br />V <br />Q <br />O <br />City Council <br />23 — 109 <br />4/19/2022 <br />Ln <br />N <br />
The URL can be used to link to this page
Your browser does not support the video tag.