My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-04-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
04/19/2022 Regular
>
Agenda Packet_2022-04-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2022 11:39:43 AM
Creation date
4/18/2022 10:54:36 AM
Metadata
Fields
Template:
City Clerk
Date
4/19/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
969
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-S A N TA A N A LIBRARY R E N D VAMNROPOSAL <br />-WDRAFT WORK PLAN <br />■ Project controls and <br />■ Conceptual design op <br />ions <br />communication tools <br />■ Interior design values <br />■ Review available <br />■ Children's Library visior <br />ing <br />documents and <br />■ Refine preferred desigt <br />option <br />information <br />■ Interior/exterior render <br />ngs <br />■ Site and building <br />■ Building system narrati <br />es <br />assessment <br />■ Preliminary code analy <br />is <br />■ Preliminary project <br />■ Technical meetings <br />cost model <br />■ Updated project cost model <br />■ Program verification <br />■ Confirm project <br />scope and budget <br />■ Confirm applicable <br />historic registry <br />requirements <br />Project Management Teham (PMT) <br />■ Develop 50% design <br />package — drawings, outline <br />specific tions <br />■ Technic I meetings <br />■ 50% estimate of probable <br />construction cost <br />■ Develop 90% plan <br />check package — all <br />disciplines <br />■ Technical meetings <br />■ 90% estimate of <br />probable construction <br />cost <br />■ Submit plan check <br />set for Public Works <br />CIP Engineering and <br />Library staff review <br />Staff + <br />Technical <br />Llbr Staff LStaff TM: Planning ibra Lib TM: Planning TM: Planning <br />and Building and Building and Building <br />Stakeholders + <br />0 1� <br />HRC City Council <br />23 - 111 <br />H0 <br />■ Develop 100% <br />backcheck/bid set <br />■ Submit backcheck set <br />to Library, Planning <br />and Building, HRC, <br />Public Works CIP <br />Engineering <br />■ FIFE procurement <br />package <br />■ Updated estimate of <br />probable construction <br />cost <br />G R 0 U P 4 <br />■ Pre -bid <br />■ Attend pre -construction <br />meeting <br />meeting, jobsite meetings + <br />■ Respond <br />job inspection visits <br />to bidders' <br />■ Respond to RFIs <br />questions <br />■ Review contractor submittals <br />■ Addenda <br />■ Punch list review <br />■ Review furniture installation <br />■ Compile certificates, record <br />drawings, warranties, <br />manuals, etc. <br />Construction Meetings <br />0000000000000000000 <br />GROUNDBREAKING 4/19/2022 <br />0 <br />HRC City Council <br />RE -OPENING <br />
The URL can be used to link to this page
Your browser does not support the video tag.