My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-04-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
04/19/2022 Regular
>
Agenda Packet_2022-04-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2022 11:39:43 AM
Creation date
4/18/2022 10:54:36 AM
Metadata
Fields
Template:
City Clerk
Date
4/19/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
969
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D COMPENSATION <br />1. COMPENSATION FOR BASIC SERVICES <br />LA Compensation to the Consultant for Basic Services described in Exhibit A, shall be a <br />stipulated sum of One Million Six Hundred Twenty Four Thousand, One Hundred and Thirty <br />Two Dollars ($1,624,132.00). <br />Consultant shall invoice the City monthly on a percent complete basis for work completed to <br />date. Basic Compensation per project phase shall not exceed the following portions of the <br />Basic Services compensation by Phase unless approved by the City. <br />Task 1 Pre -Design $ 93,214.00 <br />Task 2 Schematic Design $ 241,724.00 <br />Task 3 Design Development (50%) $ 322,300.00 <br />Task 4 Construction Documents (90%/100%) $ 564,023.00 <br />Task 5 Bidding, CA, Record Documents $402,873.00 <br />Total Basic Compensation (Tasks 1-5) $1,624,132.00 <br />At the start of this project the City has not yet determined a project or construction budget. <br />The Consultant based the above fee for architectural, engineering, and related design services <br />on an estimated construction budget of approximately $17,900,000 (which was calculated <br />using an allowance of $450/sf applied across the full 39,790 existing square feet). This <br />budget is intended to be an allowance for site, building envelope, interior architecture, <br />building systems upgrades, FFE and related services. The fee and scope can be adjusted down <br />or up to correspond to available funding and established project budget. <br />2. COMPENSATION FOR OPTIONAL SERVICES <br />2.A Compensation to the Consultant for Optional Services described in Exhibit A are not included <br />in the Consultant's Scope of Basic Services. When authorized in writing by the City, the <br />Consultant shall be compensated for Optional Services in addition to compensation for Basic <br />Services and Reimbursable Expenses. <br />Option 1: Children's Thematics -Schematic Design/Procurement Package $ 65,000.00 <br />Option 2: Elevator Design and Consulting Services Task 3-5 $ 38,200.00 <br />Maximum Compensation for Pre -negotiated Optional Services $103,200.00 <br />3. COMPENSATION FOR ADDITIONAL SERVICES <br />3.A Compensation to the Consultant for Additional Services described in Exhibit A is in addition <br />to compensation for Basic Services and Optional Services and shall be either at the hourly <br />rates in Exhibit B2 or made as a negotiated stipulated sum. The rates in Exhibit B2 will be in <br />effect through December 315t, 2022 and are subject to annual revisions at the start of each <br />calendar year. <br />3.B Additional Services Contingency. This Agreement includes an allowance for other City <br />authorized Additional Services: <br />Additional Services Allowance <br />$200,000.00 <br />4. COMPENSATION FOR REIMBURSABLE EXPENSES <br />4.A Customary Reimbursable expenses described in Exhibit A are included in the compensation <br />for Basic or Optional Services. <br />Exhibi Ity� OUC1Clyn w e 7771777 ocx 23 — 124 4/19/26F " 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.