My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-04-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
04/19/2022 Regular
>
Agenda Packet_2022-04-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2022 11:39:43 AM
Creation date
4/18/2022 10:54:36 AM
Metadata
Fields
Template:
City Clerk
Date
4/19/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
969
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and performed in accordance with the Office of Historical Preservation's <br />"Archaeological Resource Management Reports (ARMR): Recommended Contents <br />and Format" (OHP 1990) and "Guidelines for Archaeological Research Designs" (OHP <br />1991). <br />CUL-6 If the archaeological assessment did not identify archaeological resources but found <br />the area to be highly sensitive for archaeological resources, a qualified archaeologist <br />shall monitor all ground -disturbing construction and pre -construction activities in areas <br />with previously undisturbed soil. The archaeologist shall inform all construction <br />personnel prior to construction activities of the proper procedures in the event of an <br />archaeological discovery. The training shall be held in conjunction with the project's <br />initial on -site safety meeting and shall explain the importance and legal basis for the <br />protection of significant archaeological resources. In the event that archaeological <br />resources (artifacts or features) are exposed during ground -disturbing activities, <br />construction activities in the immediate vicinity of the discovery shall be halted while <br />the resources are evaluated for significance by an archaeologist who meets the <br />Secretary's Standards, and tribal consultation shall be conducted in the case of a tribal <br />resource. If the discovery proves to be significant, the long-term disposition of any <br />collected materials should be determined in consultation with the affiliated tribe(s), <br />where relevant; this could include curation with a recognized scientific or educational <br />repository, transfer to the tribe, or respectful reinternment in an area designated by the <br />tribe. <br />CUL-7 If an Archaeological Resources Assessment does not identify potentially significant <br />archaeological resources but the site has moderate sensitivity for archaeological <br />resources (Mitigation Measure CUL-4), an archaeologist who meets the Secretary's <br />Standards shall be retained on call. The archaeologist shall inform all construction <br />personnel prior to construction activities about the proper procedures in the event of <br />an archaeological discovery. The pre -construction training shall be held in conjunction <br />with the project's initial on -site safety meeting and shall explain the importance and <br />legal basis for the protection of significant archaeological resources. In the event that <br />archaeological resources (artifacts or features) are exposed during ground -disturbing <br />activities, construction activities in the immediate vicinity of the discovery shall be <br />halted while the on -call archaeologist is contacted. The resource shall be evaluated <br />for significance and tribal consultation shall be conducted, in the case of a tribal <br />resource. If the discovery proves to be significant, the long-term disposition of any <br />collected materials should be determined in consultation with the affiliated tribe(s), <br />where relevant. <br />Finding <br />Finding 1. The City hereby makes Finding 1. Changes or alterations have been required in, or <br />incorporated into, the project that avoid or substantially lessen the significant environmental effect <br />as identified in the PEIR. These changes are identified in the form of the mitigation measures <br />Santa Ana General Plan Update <br />Of 1 i 5 � Fact an Statement 30 — 82 4� /?b02?2 <br />Of v ri ing onsiderations -31- c o er 021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.