|
Exhibit 1
<br /> Appendix
<br /> ATTACHMENT 1
<br /> SCOPE OF WORK
<br /> CITY OF SANTA ANA
<br /> REQUEST FOR PROPOSALS
<br /> RFP NO.: 22-031
<br /> Description of Work
<br /> It is the intent of this agreement to continually improve the quality of the facilities. The
<br /> Contractor shall provide all labor, training, materials, tools, equipment, transportation, hauling,
<br /> dumping, chemicals and other items needed to perform high quality park janitorial maintenance
<br /> pursuant to the terms defined herein. This RFP identifies facilities in to two groups, park
<br /> restrooms and park buildings. Park buildings include community centers (including gymnasium,
<br /> if applicable) and other facilities that are not stand-alone restroom-only structures, which are
<br /> considered park restrooms.
<br /> The Contractor shall provide all park restroom janitorial maintenance at work sites listed herein,
<br /> including, but not limited to cleaning, scrubbing, polishing, toilets, urinals, doors, walls, floors,
<br /> ceilings, windows, partitions, dispensers, hand rails plumbing fixtures, and replacing burned out
<br /> lights, lens covers, removing foreign materials i.e. paper wads stuck to ceilings, walls, etc. In
<br /> addition, the Contractor shall clean the exterior of the building surfaces including the walls, roof,
<br /> windows, etc. and, other services required to maintain the work sites in a safe, attractive and
<br /> useable condition.
<br /> The Contractor shall provide all park building janitorial maintenance at work sites listed herein,
<br /> including, but not limited to cleaning, scrubbing, polishing of windows, desks, cabinets,
<br /> computers, phones, kitchen appliances, hanging amenities (clocks, pictures, Knox boxes,
<br /> etc.),toilets, urinals, doors, walls, floors, ceilings, windows, partitions, dispensers, hand rails
<br /> plumbing fixtures, and replacing burned out lights at the contractors expense, lens covers,
<br /> removing foreign materials i.e. paper wads stuck to ceilings, walls, etc. In addition, the
<br /> Contractor shall clean the exterior of the building surfaces required to maintain the work sites in
<br /> a safe, attractive and useable condition.
<br /> Contractor understands that it is assuming maintenance responsibility of the parks/locations "as
<br /> is" and is responsible for improving all aspects of the parks facilities to the quality described in
<br /> these specifications and interpreted by the City's Representative.
<br /> Proposers shall be responsible for monitoring the site to obtain information regarding this
<br /> solicitation.
<br /> (.itv r.ni inril 9 — 1 d R/q/9n99
<br /> City of Santa Ana RFP 22-031
<br /> Page 12
<br />
|