My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-05-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
05/03/2022 Special and Regular & HA
>
Agenda Packet_2022-05-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 10:10:44 AM
Creation date
4/28/2022 9:49:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
5/3/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 1 <br /> reserves the right to issue a Stop Work Notice if the Contractor does not promptly repair <br /> any damage, within twenty-four(24) hours of the damage incurred. <br /> 11.2 If the Directors Representative requests or directs the Contractor to perform work in a <br /> given area, it will be the Contractor's responsibility to verify and locate any underground <br /> systems (i.e. utility lines) and take responsibility for taking reasonable precaution when <br /> working in these areas. <br /> 11.3 Contractor shall call Underground Alert (800) 422-4133) at least two working days prior <br /> to digging for line locations. Any damage or problems shall be reported immediately to <br /> the Director's Representative and the City of Santa Ana. If the Contractor discovers <br /> something unexpected or a unique problem occurs, he should stop work and immediately <br /> contact an authorized Director's Representative for a timely resolution of the problem. <br /> 12.0 SUBSTITUTIONS <br /> Whenever a specific type of material is specified, no substitutions shall be allowed without <br /> written consent of the SAPRF representative. <br /> 13.0 CERTIFICATION& APPLICATION OF MATERIALS <br /> 13.1 All materials shall be delivered on the site in original containers. Materials shall be <br /> subject to inspection by the Director's Representative. The Director's Representative <br /> will not approve materials not meeting the SAPRF standards, and Contractor shall return <br /> any such non-satisfactory items at his/her cost. <br /> 13.2 No materials shall be applied prior to the Director's Representative verifying the <br /> specified quantities of materials. Furthermore, should the Contractor apply materials <br /> before the Director's Representative verifies correct materials and quantities, the <br /> Contractor shall not receive credit for the applied materials. The Contractor shall then <br /> reorder and deliver the materials, thereby not receiving credit for the applied materials. <br /> 14.0 CONTRACTOR NEGLECT <br /> Any damage to the City of Santa Ana, SAPRF, or private property, which has been determined <br /> to be due to the Contractor's neglect, shall be corrected at no additional cost to the City of Santa <br /> Ana or the SAPRF. <br /> 15.0 CONSTRUCTION EQUIPMENT <br /> The Contractor shall take all necessary precautions for safe operation of his equipment and the <br /> protection of the public from injury and damage from such equipment. <br /> 16.0 SOUND CONTROL REQUIREMENTS <br /> The Contractor shall comply with all local sound control and noise level rules, regulations and <br /> ordinances that apply to any work performed pursuant to the Contract. Each internal combustion <br /> engine used for any purpose on the job or related to the job shall be equipped with a muffler of a <br /> type recommended by the manufacturer of such equipment. No internal combustion engine shall <br /> be operated on the project without said muffler. Full compensation for conforming to the <br /> requirements of this section shall be considered as included in the prices paid for the various <br /> contract items of work involved and no additional compensation will be allowed therefore. <br /> Sounds, such as loud music, that are not related to the project, shall be kept at levels so as to not <br /> disturb the general public. <br /> (.itv rni inril 7c, — 77 <br /> City of Santa Ana RFP 22-031 <br /> Page 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.