My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VALLEY MAINTENANCE CORPORATION (7)
Clerk
>
Contracts / Agreements
>
V
>
VALLEY MAINTENANCE CORPORATION (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2022 9:02:10 AM
Creation date
5/19/2022 9:00:50 AM
Metadata
Fields
Template:
Contracts
Company Name
VALLEY MAINTENANCE CORPORATION
Contract #
A-2022-068
Agency
Parks, Recreation, & Community Services
Council Approval Date
5/3/2022
Expiration Date
5/31/2026
Insurance Exp Date
5/24/2022
Destruction Year
2031
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.2.1 Spray and Buffing of Hard Floors -Clean and restore a uniform glass and <br />protective finish to resilient tile or terrazzo floors that are finished with a floor <br />finish. All chairs, trash receptacles, etc., shall be tilted or moved where necessary <br />to spray buff underneath. The entire floor shall have a uniform coating of floor <br />finish. All spray buff solution shall be removed from baseboards, furniture, trash <br />receptacles, etc. <br />3.2.2 Dusting of Ceiling, Atrium Ledges, Lunchroom Drywall Ledges and HVAC Wall <br />Vents -Clean all HAVAC vents and area immediately surround them. Dust all <br />atrium ledges at the glass/wood railing areas and at the atrium stairs. Dust <br />lunchroom drywall edges. Care shall be taken not to spread dust into the air. <br />3.2.3 High Dusting -Remove dust, cobwebs, oily film, etc., from all fixtures and <br />surfaces above 11 feet from the floor surface. This would include lights, grills, <br />light fixtures, pipes, sprinkler systems, cables, ledges, walls, atrium wood and <br />ledges, ceilings, vents, etc. Care shall be taken not to spread dust into the air. <br />3.2.4 Inspect shower curtains. If curtains are worn, the Contractor shall replace them at <br />his own expense with a shower curtain product acceptable to the City's <br />Representative. <br />3.2.5 Clean light fixtures and protective coverings inside and out using approved <br />germicidal cleanser. <br />3.3 Monthly Cleaning Schedule <br />3.3.1 Carpeted Floors -Pile lift carpet floors in all areas. <br />3.3.2 Carpeted Floors — Bi-Monthly* - Spin bonnet all carpeted floors every two (2) <br />months. *(calculate to monthly cost for bidding purposes). January; March; May; <br />July; September and November. <br />3.3.3 Tile Floors -Spray buff all tile floors. Clean and resurface floor surfaces using <br />approved products per the manufacturer's specifications. <br />3.3.4 Use pumice stone or other product/toot to remove mineral buildup from around <br />fixtures in the restroom. <br />3.3.5 Pressure -wash all exterior wall and pavement surfaces to remove dirt, gum, dust, <br />debris, stains, etc. to within 50' of the building. <br />3.4 Quarterly Cleaning Schedule <br />3.4A Tile Floors —Strip and wax all tile floors quarterly. *(calculate to monthly cost for <br />bidding purposes) <br />3.5 Bi-Annual Cleaning Schedule <br />3.5.1 Clean roofs free of leaves and all other debris. <br />3.5.2 Pressure washes metal roofs to remove dirt, dust, debris, stains, etc. <br />3.5.3 Carpeted Floors — Semi -Annually* - Extract clean carpeted floors two (2) times <br />per year. *(calculate to monthly cost for bidding purposes) April and October <br />3.5.4 Scrub floors and base boards completely clean of dirt, grim, stains, etc. using a <br />power walk -behind floor scrubber and hand held power scrubber being careful not <br />to damage flooring. <br />4.0 PARK BUILDING MAINTENANCE -GYMNASIUM <br />City of Santa Ana RFP 22-031 <br />Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.