Laserfiche WebLink
PLANNING & BUILDING AGENCY <br />!!!W FISCAL YEAR 2022-2023 FEE SCHEDULE <br />SECTION IX <br />ACCOUNT MISCELLANEOUS FEE UNIT ADOPTED PROPOSED DEPARTMENT <br />FY 21-22 FEES FY 22-23 FEES CHANGES <br />178) <br />1,200 amperes and over <br />Motor, Transformer, Welder, Industrial Equipment, Oven, <br />Rectifier, Generator, Surge Arrestor, Water Heater, Photovoltaic <br />Panel or other Power Equipment. <br />179) <br />0 to 1 HP, kW or kVA <br />180) <br />Over 1 to 10 HP, kW or kVA <br />181) <br />Over 10 to 50 HP, kW or kVA <br />182) <br />Over 50 to 100 HP, kW or kVA <br />183) <br />Over 100 to 500 HP, kW or kVA <br />184) <br />Over 500 HP, kW or kVA <br />Low Voltage: phone, data outlet, speaker, thermostat, door holder, <br />doorbell, pull station, smoke detector, alarm device, card reader, etc. <br />185) <br />Commercial: <br />FIRST 10 devices or outlets <br />186) <br />Additional Devices <br />187) <br />Each control panel, power supply annunciator, switch or auxiliary equipment <br />188) <br />Residential: <br />Single Dwelling Unit <br />260.79 <br />269.92 <br />3.84 <br />3.97 <br />25.09 <br />25.97 <br />49.78 <br />51.52 <br />113.06 <br />117.02 <br />162.45 <br />168.14 <br />202.92 <br />210.02 <br />36.50 <br />37.78 <br />3.45 <br />3.57 <br />17.39 <br />18.00 <br />39.56 <br />40.94 <br />City Council <br />14 697of 158 <br />6/7/2022 <br />