Laserfiche WebLink
PLANNING & BUILDING AGENCY <br />FISCAL YEAR 2022-2023 FEE SCHEDULE <br />SECTION IX <br />EOE] <br />Fm <br />SCELLANEOUS FEE UNIT ADOPTED PROPOSED DEPARTMENT <br />FY 21-22 FEES FY 22-23 FEES I CHANGES <br />51604 <br />51604 <br />51604 <br />51604 <br />51604 <br />51604 <br />51604 <br />51604 <br />51604 <br />51604 <br />51604 <br />51604 <br />51604 <br />51604 <br />51604 <br />241) <br />Absorption System <br />Up to 1,000,000 BTU <br />242) <br />1,000,001 to 1,750,000 BTU <br />243) <br />1,750,001 and over <br />244) <br />Commercial Cooking Equipment (Ovens/Fryers/Etc.) <br />245) <br />Condensate Pump <br />246) <br />Kiln <20cubic feet (includes hood and duct) <br />247) <br />Air Compressor (each includes piping) <br />248) <br />Cooling Tower <br />249) <br />Heat Exchanger <br />250) <br />Electrostatic Precipitator <br />251) <br />Vacuum Cleaner System (Residential) <br />252) <br />Humidifier <br />253) <br />Duct Heater <br />254) <br />Wood Sawdust System <br />255) <br />Incinerator (Residential) <br />84.34 <br />119.89 <br />202.92 <br />46.14 <br />34.46 <br />71.16 <br />71.16 <br />71.16 <br />65.22 <br />42.10 <br />71.16 <br />42.16 <br />71.16 <br />152.88 <br />47.44 <br />87.29 <br />124.09 <br />210.02 <br />47.75 <br />35.67 <br />73.65 <br />73.65 <br />73.65 <br />67.50 <br />43.57 <br />73.65 <br />43.64 <br />73.65 <br />158.23 <br />49.10 <br />City Council <br />14 7 of 158 <br />6/7/2022 <br />