My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-06-07
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/07/2022 Regular & HA
>
Agenda Packet_2022-06-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2022 12:57:25 PM
Creation date
6/6/2022 11:36:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
6/7/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANNING & BUILDING AGENCY <br />FISCAL YEAR 2022-2023 FEE SCHEDULE <br />SECTION IX <br />ACCOUNT [MISCELLANEOUS FEE UNIT ADOPTED LPROPOSED DEPARTMENT <br />FY 21-22 FEES FY 22-23 FEE L CHANGES <br />51611 <br />51611 <br />51611 <br />51611 <br />51611 <br />51611 <br />51611 <br />51611 <br />51601 <br />5XXXX <br />7) Water piping replacement, each 100 feet <br />8) Gas piping service, 1-5 outlets <br />9) Backflow prevention device <br />10) For each appliance or piece of equipment regulated <br />by this code for which no fee is listed <br />11) Inspections outside of normal business hours <br />(4 hour minimum charge for Holidays, Saturday <br />and Sunday inspections) <br />12) Re -inspection fee assessed under provisions of the <br />Building Code <br />13) Inspections for which no fee is specifically indicated <br />(minimum charge - one (1) hour) <br />14) Additional plan review required by changes, <br />additions, or revisions to approved plans (minimum <br />charge - one (1) hour) <br />SOLAR PLAN CHECK FEES <br />Whenever solar plans are required by the Building Official, <br />plan check fees shall be 65% of the solar permit fee and <br />shall be paid at the time of submitting plans. <br />Electronic Plan Submittal Fee <br />Structural Peer Review <br />Each <br />Each <br />Each <br />Each <br />Per Hour <br />Per Hour <br />Per Hour <br />Per Hour <br />24.69 <br />25.00 <br />25.55 <br />25.55 <br />12.75 <br />12.75 <br />107.91 <br />107.91 <br />107.91 <br />107.91 <br />25.88 <br />At Cost <br />New Fee <br />City Council <br />14 85of 158 <br />6/7/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.