My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2022-06-07
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/07/2022 Regular & HA
>
Agenda Packet_2022-06-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2022 12:57:25 PM
Creation date
6/6/2022 11:36:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
6/7/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Agency <br />1. Temporary Construction Meter Deposit <br />Existing Fee: $2,096.50 <br />Proposed Fee: $3,168.00 <br />Fee updated to cover the costs for City to replace construction meter and backflow device parts due to damage or theft/lost. <br />2. Backflow Preventer 3rd and Final Notice Fee <br />Existing Fee: $117.23 <br />Proposed Fee: $190.00 <br />Fee updated to factor staffing costs. <br />3. Fire Flow Witness Fee <br />Existing Fee: $128.42 <br />Proposed Fee: $244.00 <br />Fee updated to factor staffing costs. <br />4. Install New Water Service Meter Fee 5/8" <br />Existing Fee: $125.03 <br />Proposed Fee: $465.00 <br />Fee updated to factor in AMI equipment implementation, related material and staffing costs. <br />City Council 14 — 144 6/7/2022 <br />135 of 158 <br />
The URL can be used to link to this page
Your browser does not support the video tag.