Laserfiche WebLink
n; f.S Pd'7 i'si: <br />Sulnlinn Excellence <br />Section 4 - Rate and Service Structure - Items a) through j) are priced <br />per the Attachment 1, Scope of Work of the RFP 22-068 <br />Total <br />a) Board up cost of 1st standard window <br />$274.62 <br />$245.73 <br />$375.21 <br />$346.37 <br />(1) each additional window thereafter <br />b) Board up cost of 1st single door opening <br />(1) each additional door thereafter <br />c) Board up cost of a garage - our pricing assumes a single car garage (8' <br />wide by 7" tall) roll up door. <br />$424.38 <br />d) Bolt, screw door, garages and windows <br />$100.30 <br />e) Chain and lock fee (3' of 5/16 galvanized chain and one combination <br />padlock). <br />$131.29 <br />f) Weed abatement service: includes mow, hand weed, abatement, <br />blow off sidewalks, edging and handwork of perimeter, disposal etc., <br />(primarily neglected residential property) per hour rate. <br />$82.22 <br />g) Small scale- Debris removal service; cost per ton. Includes clean-up <br />debris by hand, disposal (no heavy equipment). <br />$912.55 <br />h) Large Scale - Debris removal service cost, unpermitted <br />encampments. Cost of heavy equipment that include but may not be <br />limited to Track Loaders, Truck and semi -end dump trailer <br />combinations, Water trucks, high reach fork -lifts, stake bed trucks, <br />backhoes, skip loaders, tractors, and additional service trucks and <br />machinery to assist. Our rate includes one track skid steer with a <br />grapple bucket, one skid steer operator, two general laborers doing <br />hand work, one super 10 end dump- dump truck and driver. <br />$9,212.86 <br />h) Travel charge per hour <br />$192 44 <br />i) After hour charge per hour <br />$250.51 <br />The above pricing schedule for RFP 22-068 is provided and approved by SLS <br />Property Solutions, Inc. <br />ra #Ltrader, President <br />Y' o!1 l! l[ S! I l \ i l:' U 11 1 rh1. � I? i 1 1\. I.f I� - 'Of <br />