My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Packet_06-13-22
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2022
>
6-13-22
>
Packet_06-13-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2022 5:22:28 PM
Creation date
7/11/2022 5:21:33 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Resolution No. 2022-XXX <br />Page 1 of 2 <br />RESOLUTION NO. 2022-XXX <br /> <br />A RESOLUTION OF THE PLANNING COMMISSION OF <br />THE CITY OF SANTA ANA DETERMINING GENERAL <br />PLAN CONFORMITY FOR THE CONVEYANCE OF <br />EASEMENTS BY THE ORANGE COUNTY FLOOD <br />CONTROL DISTRICT OVER THE SANTA ANA RIVER FOR <br />THE CITY’S REPLACEMENT OF THE FAIRVIEW STREET <br />BRIDGE <br /> <br />WHEREAS, the Orange County Flood Control District (OCFCD) is preparing to <br />convey easements over the Santa Ana River to the City of Santa Ana in connection <br />with the City’s replacement of the Fairview Street Bridge, as shown on Exhibit A; and <br /> <br />WHEREAS, California Government Code Section 65402(b) provides in <br />pertinent part that a county shall not dispose of real property within the corporate limits <br />of a city if such city has an adopted a general plan applicable to the area until the <br />location, purpose, and extent of such disposition have been submitted to and reported <br />upon by the planning agency as to the conformity with the general plan; and <br /> <br />WHEREAS, the existing Fairview Street Bridge will be replaced by the City with <br />a new six-lane bridge (three lanes in each direction), including a complete bridge deck <br />with barrier rails, sidewalks, bicycle lanes, a raised median and lighting; and <br /> <br />WHEREAS, all required environmental review for this project has been <br />completed and approved by the City Council; and <br /> <br />WHEREAS, in a letter dated May 10, 2022, OCFCD has requested that the <br />Planning Commission render a determination of general plan conformity for its <br />proposed conveyance of easements to the City in connection with the City’s <br />replacement of the Fairview Street Bridge. <br /> <br />NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of the City <br />of Santa Ana as follows: <br /> <br />Section 1. The recitals set forth above are adopted as findings in support of <br />this Resolution. <br /> <br />Section 2. The replacement of the Fairview Street Bridge and related <br />improvements by the City are consistent with City’s 2022 General Plan, specifically <br />Mobility Element Goals 1, 2, and 5; Public Service Element Goal 1; Open Space Goals <br />2 and 3; and Housing Element Goal 1. <br /> <br /> <br />6/13/2022 <br />Planning Commission 5 –4
The URL can be used to link to this page
Your browser does not support the video tag.